rehearsal-5 task 9/13: Executor renewal + reaper wall re-rule + device carrier #850
Labels
No labels
agent-blocked
agent-working
autopilot
bug
deferred
deploy-pending
enhancement
landing-pr
model-haiku
model-opus
model-sonnet
needs-design
needs-info
needs-triage
no-triage
out-of-scope
priority
ready-for-agent
ready-for-human
ready-for-session
rehearsal-183
snapshot-pending
standing-drive
wayfinder:grilling
wayfinder:map
wayfinder:prototype
wayfinder:research
wayfinder:task
wontfix
No milestone
No project
No assignees
2 participants
Notifications
Due date
No due date set.
Blocks
Depends on
Reference
Matou/idss#850
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Part of the #183 phase-5 rehearsal arc (device-add + Nextcloud-on-device on a standing rented community).
docs/superpowers/specs/2026-08-25-183-phase-5-device-nextcloud-rehearsal-design.mddocs/superpowers/plans/2026-08-25-183-phase-5-device-nextcloud-rehearsal.md— this ticket is Task 9, carried verbatim below. The plan's Global Constraints apply to every step.Task 9: Executor renewal + reaper wall re-rule + device carrier
Files:
scripts/rehearsal-executor.sh(each tick:[ -d "$OC_STANDING_DIR" ] && oc_standing_renew)scripts/rental-reap.sh(wall destroys only lease-less boxes; a futureidss-rental-expires-*tag governs alone),scripts/tests/rental-reap-test.shbroker/internal/broker/rentals.go(+ test):Renewre-tags the provider droplet'sidss-rental-expires-<epoch>(verify first — #723 may already do it; the test pins it either way)scripts/lib/rehearsal-droplet.sh—oc_device_create/oc_device_teardown(clone theoc_droplet_createshape at:346:clan-lab create --purpose rehearsal --fresh --ttl 6 --size s-2vcpu-4gb, exportsOC_E2E_DEVICE_IP, bounded SSH wait; teardown deletes by id and never touches the standing gateway)STATUS.mdInterfaces:
Consumes: Task 8's
oc_standing_renew;rental-reap.shconstants (RENTAL_TAG,EXPIRES_PREFIX,WALL_HOURS,DRIVE_NAME_PREFIX); clan-lab's create/reap contract (device droplets stay clan-lab-reapable — GOTCHAS #48's split does not grow).Produces:
OC_E2E_DEVICE_IPexported for the journey; the standing gateway survives as long as the executor renews (lease tags keep advancing) and lapses honestly when it stops; drive-wall behavior for lease-less drive boxes unchanged (pin with a regression case in the reap test).Step 1: Extend the reap offline test (failing): a box with a future expires tag older than the wall SURVIVES; a lease-less
idss-gateway-rehearsal-*box older than the wall is destroyed (today's behavior, kept); a lapsed lease is destroyed (kept).Step 2: Run
bash scripts/tests/rental-reap-test.sh→ FAIL; implement; → PASS.Step 3: Broker renew re-tag — read
rentals.go/#723's landing; write the failing testTestRenew_AdvancesProviderExpiresTagagainst the fake provider (growProviderwithRetag(ctx, id string, tags []string) errorif absent); implement;cd broker && go test ./...→ PASS.Step 4:
oc_device_create/teardown + executor tick line;bash -nboth; extendscripts/tests/rehearsal-rented-target-test.sh's pattern with a device-carrier offline test (fake clan-lab).Step 5: Commit —
git commit -m "rehearsal-5: standing lease renewal + wall re-rule + device droplet carrier (ADR 0207/0209) (task 9 of #<ticket>)".Global Constraints (from the plan)
failure is a named error, never a masked success. No sandbox-green claim (#377).
at P4-S3x; the takeover runs at provisioning's first deploy, never at join.
commit, then two single-node
clan.Deploycalls, device first (ruling: aroute to a dead service is the honest failure, a service with no route is
invisible).
test-results/standing-rented/; staleness gate =oc_bootstrap_stalenesspattern overagent/ go.mod go.sum internal/; thereaper stays honest — renewal, not exemption (
idss-rental-holdis forhumans, the executor never sets it).
#721/#722 (workstation) keep running; the prefix extraction (Task 10) is
behavior-preserving and #720 must stay green across it. Never touch the
executors' env files from a ticket.
POST/DELETE /issues/<n>/labels, never in anissue PATCH. "closes #NNN" in commit messages auto-closes — say "task N of
#NNN" instead.
git ls-tree origin/main docs/adr/at mint (IDIP + observability swarm lanes are minting concurrently).
git pull --rebaseimmediately before a STATUS commit (shared checkout).gofmt,go vet ./...,go test ./...green; TS:pnpm -r typecheck+unit suites green, pre-land.
journey.device.spec.ts+ device-add fixtures--target device+ standing preflight wiringADR numbers ruled at mint — read 0207 → 0208, 0208 → 0209, 0209 → 0210
Task 1 (#842) has landed the phase-5 design tier. This ticket's body carries the
plan's assumed ADR numbers; they shifted by one at mint, exactly as the
Global Constraints line in your body told you to re-check.
/getWhy:
docs/adr/0207-design-keri-stack-version-pins.md(#771, the concurrentIDIP lane) had taken 0207 on
origin/mainbefore this arc minted.Use the ruled numbers in your commit messages and code comments. The plan
(
docs/superpowers/plans/2026-08-25-183-phase-5-device-nextcloud-rehearsal.md)is updated and records the mapping; commit
70a3bce6.Ruled by agent under ADR 0174 — veto anytime.
swarm-claim host=elitebook-distributed-server-03 run=10098
(automated multi-host claim — lowest live claim id works this ticket)
close-report for #850 — status
success✅ close-report gates passed — every claim verified against main; issue closed.
envelope