rehearsal-5 task 8/13: Standing-community lib + launch stateDir override #849
Labels
No labels
agent-blocked
agent-working
autopilot
bug
deferred
deploy-pending
enhancement
landing-pr
model-haiku
model-opus
model-sonnet
needs-design
needs-info
needs-triage
no-triage
out-of-scope
priority
ready-for-agent
ready-for-human
ready-for-session
rehearsal-183
snapshot-pending
standing-drive
wayfinder:grilling
wayfinder:map
wayfinder:prototype
wayfinder:research
wayfinder:task
wontfix
No milestone
No project
No assignees
2 participants
Notifications
Due date
No due date set.
Blocks
Depends on
Reference
Matou/idss#849
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Part of the #183 phase-5 rehearsal arc (device-add + Nextcloud-on-device on a standing rented community).
docs/superpowers/specs/2026-08-25-183-phase-5-device-nextcloud-rehearsal-design.mddocs/superpowers/plans/2026-08-25-183-phase-5-device-nextcloud-rehearsal.md— this ticket is Task 8, carried verbatim below. The plan's Global Constraints apply to every step.Task 8: Standing-community lib + launch stateDir override
Files:
scripts/lib/rehearsal-standing-lib.shscripts/tests/rehearsal-standing-test.sh(offline: fake git + curl + facts round-trip)app/tests/e2e/fixtures/launch.ts(LaunchOptions.stateDir?: string— overrides the run-dir default)STATUS.mdInterfaces:
Consumes:
oc_bootstrap_staleness's shape (scripts/lib/bootstrap-staleness-lib.sh— copy the three-guard +rev-listpattern, same path list); broker routesPOST /v1/gateways/renew+/release,POST /v1/subdomains/offboard(bearer = claim secret);oc_slug_secret_remember(rehearsal-droplet.sh:698).Produces:
TS side:
launchApp({stateDir})launches on the given dir; the journey passesjoin(process.env.REHEARSAL_STANDING_DIR, 'state').Step 1: Write the failing offline test — facts round-trip; staleness fresh/stale/absent with a scripted git; renew posts the right body/bearer against a fake curl; teardown remembers the secret BEFORE spending it.
Step 2: Run
bash scripts/tests/rehearsal-standing-test.sh→ FAIL; implement; → PASS.Step 3: launch.ts — add the option (default unchanged);
pnpm -r typecheck→ PASS (no behavior change for existing specs — assert by running the fixtures' unit suite).Step 4: Commit —
git commit -m "rehearsal-5: standing-community lib — facts, staleness verdict, renew, teardown; launch stateDir override (ADR 0207) (task 8 of #<ticket>)".Global Constraints (from the plan)
failure is a named error, never a masked success. No sandbox-green claim (#377).
at P4-S3x; the takeover runs at provisioning's first deploy, never at join.
commit, then two single-node
clan.Deploycalls, device first (ruling: aroute to a dead service is the honest failure, a service with no route is
invisible).
test-results/standing-rented/; staleness gate =oc_bootstrap_stalenesspattern overagent/ go.mod go.sum internal/; thereaper stays honest — renewal, not exemption (
idss-rental-holdis forhumans, the executor never sets it).
#721/#722 (workstation) keep running; the prefix extraction (Task 10) is
behavior-preserving and #720 must stay green across it. Never touch the
executors' env files from a ticket.
POST/DELETE /issues/<n>/labels, never in anissue PATCH. "closes #NNN" in commit messages auto-closes — say "task N of
#NNN" instead.
git ls-tree origin/main docs/adr/at mint (IDIP + observability swarm lanes are minting concurrently).
git pull --rebaseimmediately before a STATUS commit (shared checkout).gofmt,go vet ./...,go test ./...green; TS:pnpm -r typecheck+unit suites green, pre-land.
journey.device.spec.ts+ device-add fixtures--target device+ standing preflight wiringADR numbers ruled at mint — read 0207 → 0208, 0208 → 0209, 0209 → 0210
Task 1 (#842) has landed the phase-5 design tier. This ticket's body carries the
plan's assumed ADR numbers; they shifted by one at mint, exactly as the
Global Constraints line in your body told you to re-check.
/getWhy:
docs/adr/0207-design-keri-stack-version-pins.md(#771, the concurrentIDIP lane) had taken 0207 on
origin/mainbefore this arc minted.Use the ruled numbers in your commit messages and code comments. The plan
(
docs/superpowers/plans/2026-08-25-183-phase-5-device-nextcloud-rehearsal.md)is updated and records the mapping; commit
70a3bce6.Ruled by agent under ADR 0174 — veto anytime.
swarm-claim host=elitebook-distributed-server-03 run=10098
(automated multi-host claim — lowest live claim id works this ticket)
close-report for #849 — status
success✅ close-report gates passed — every claim verified against main; issue closed.
envelope