rehearsal-5 task 7/13: Removal verb + dashboard device setup/removal wiring #848
Labels
No labels
agent-blocked
agent-working
autopilot
bug
deferred
deploy-pending
enhancement
landing-pr
model-haiku
model-opus
model-sonnet
needs-design
needs-info
needs-triage
no-triage
out-of-scope
priority
ready-for-agent
ready-for-human
ready-for-session
rehearsal-183
snapshot-pending
standing-drive
wayfinder:grilling
wayfinder:map
wayfinder:prototype
wayfinder:research
wayfinder:task
wontfix
No milestone
No project
No assignees
2 participants
Notifications
Due date
No due date set.
Blocks
Depends on
Reference
Matou/idss#848
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Part of the #183 phase-5 rehearsal arc (device-add + Nextcloud-on-device on a standing rented community).
docs/superpowers/specs/2026-08-25-183-phase-5-device-nextcloud-rehearsal-design.mddocs/superpowers/plans/2026-08-25-183-phase-5-device-nextcloud-rehearsal.md— this ticket is Task 7, carried verbatim below. The plan's Global Constraints apply to every step.Task 7: Removal verb + dashboard device setup/removal wiring
Files:
internal/controlapi/provision.go(POST /api/v1/provision/devices/{device_id}/remove), + testinternal/provision/deploy.go(RemoveDevice: LOSES-consented empty-selection deploy +Config().RemoveNode+ grant revoke), + testdashboard/src/components/shell/FleetSurface.vue(routeremove-device-<id>to the provisioning surface's remove confirm, not the mint screen),dashboard/src/lib/dashboardNavigator.ts, unit testsdashboard/src/components/provisioning/SetupSurface.vue+ActiveScreen.vue(a[data-action="remove-device"]on the device's active/change view → S3x LOSES review →[data-action="remove-and-deploy"])dashboard/src/lib/api/provisionClient.ts(+ generated client regeneration per the repo's openapi script)STATUS.mdInterfaces:
Consumes: Task 6's removal mirror; Task 3's datasets (LOSES speaks);
ReviewImpact(impact.go:87-181, already computesLoses+Action: "Remove & deploy").Produces: clicking remove on the device walks S3x (
[data-field="review-impact"]with[data-field="loses"]naming "Files & documents" and[data-status="destructive-confirm"][data-action="remove-and-deploy"]), the deploy returns the fleet to gateway-only, the front-door route is gone, the device's grant is revoked. Route + client:provisionClient.removeDevice(deviceId).Step 1: Write the failing Go tests —
TestRemoveDevice_EmptySelectionLosesConsentedThenRemovesNode, controlapi route test (202 + snapshot polling like deploy).Step 2: Run → FAIL; implement; → PASS.
Step 3: Write the failing dashboard unit test — the
remove-device-<id>intent opens the provisioning remove confirm (today's bug: lands on the mint screen — pin the fix).Step 4: Run
pnpm --filter dashboard test→ FAIL; implement the routing + screens; → PASS;pnpm -r typecheck→ PASS.Step 5: Commit —
git commit -m "rehearsal-5: device removal goes live — remove verb, LOSES confirm, fleet routing fix (ADR 0209) (task 7 of #<ticket>)".Global Constraints (from the plan)
failure is a named error, never a masked success. No sandbox-green claim (#377).
at P4-S3x; the takeover runs at provisioning's first deploy, never at join.
commit, then two single-node
clan.Deploycalls, device first (ruling: aroute to a dead service is the honest failure, a service with no route is
invisible).
test-results/standing-rented/; staleness gate =oc_bootstrap_stalenesspattern overagent/ go.mod go.sum internal/; thereaper stays honest — renewal, not exemption (
idss-rental-holdis forhumans, the executor never sets it).
#721/#722 (workstation) keep running; the prefix extraction (Task 10) is
behavior-preserving and #720 must stay green across it. Never touch the
executors' env files from a ticket.
POST/DELETE /issues/<n>/labels, never in anissue PATCH. "closes #NNN" in commit messages auto-closes — say "task N of
#NNN" instead.
git ls-tree origin/main docs/adr/at mint (IDIP + observability swarm lanes are minting concurrently).
git pull --rebaseimmediately before a STATUS commit (shared checkout).gofmt,go vet ./...,go test ./...green; TS:pnpm -r typecheck+unit suites green, pre-land.
journey.device.spec.ts+ device-add fixturesADR numbers ruled at mint — read 0207 → 0208, 0208 → 0209, 0209 → 0210
Task 1 (#842) has landed the phase-5 design tier. This ticket's body carries the
plan's assumed ADR numbers; they shifted by one at mint, exactly as the
Global Constraints line in your body told you to re-check.
/getWhy:
docs/adr/0207-design-keri-stack-version-pins.md(#771, the concurrentIDIP lane) had taken 0207 on
origin/mainbefore this arc minted.Use the ruled numbers in your commit messages and code comments. The plan
(
docs/superpowers/plans/2026-08-25-183-phase-5-device-nextcloud-rehearsal.md)is updated and records the mapping; commit
70a3bce6.Ruled by agent under ADR 0174 — veto anytime.
swarm-claim host=elitebook-distributed-server-03 run=10107
(automated multi-host claim — lowest live claim id works this ticket)
close-report for #848 — status
success⛔ close-report gates REFUSED this close — the following claims did not verify:
f6eea35311is not reachable from origin/main (not landed)envelope
close-report for #848 — status
success✅ close-report gates passed — every claim verified against main; issue closed.
envelope