rehearsal-5 task 6/13: Placement deploy — device closure + gateway route, two nodes #847
Labels
No labels
agent-blocked
agent-working
autopilot
bug
deferred
deploy-pending
enhancement
landing-pr
model-haiku
model-opus
model-sonnet
needs-design
needs-info
needs-triage
no-triage
out-of-scope
priority
ready-for-agent
ready-for-human
ready-for-session
rehearsal-183
snapshot-pending
standing-drive
wayfinder:grilling
wayfinder:map
wayfinder:prototype
wayfinder:research
wayfinder:task
wontfix
No milestone
No project
No assignees
2 participants
Notifications
Due date
No due date set.
Blocks
Depends on
Reference
Matou/idss#847
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Part of the #183 phase-5 rehearsal arc (device-add + Nextcloud-on-device on a standing rented community).
docs/superpowers/specs/2026-08-25-183-phase-5-device-nextcloud-rehearsal-design.mddocs/superpowers/plans/2026-08-25-183-phase-5-device-nextcloud-rehearsal.md— this ticket is Task 6, carried verbatim below. The plan's Global Constraints apply to every step.Task 6: Placement deploy — device closure + gateway route, two nodes
Files:
internal/provision/deploy.go(attachFilesCohost→attachFilesPlacementhandling both shapes; two-node apply),deploy_test.gointernal/provision/takeover.go(the takeover enroll passesTarget: "root@<MeshAddress>"from the fleet device)STATUS.mdInterfaces:
Consumes: Task 3's
Device.MeshAddress; Task 5'sComposeMemberModules,RenderFilesIdPClient, device-shapeFilesLiveSet;AttachFrontDoor(frontdoor_attach.go:113) withLiveService{Slug: clan.FilesSlug, MeshTarget: "<mesh-ip>:80", ExemptPaths: clan.FilesExemptPaths}; the public-branch LiveSet re-supply (deploy.go:602-608).Produces: a files-on-device deploy commits ONE revision containing
machines/<device>/{files.nix,configuration.nix}+machines/<gateway>/{front-door.nix,files-idp.nix}, then applies device first, gateway second (twoapplyRevisioncalls, eachNodes: []clan.NodeID{n}); a device deploy withTakeoverReadyrunsdeployTakeoverwhose enroll carries the mesh Target. Removal mirror: deselecting files detaches the module, rewrites the front door without the route, deploys gateway.Step 1: Write the failing deploy tests — extend
deploy_test.go's totara fixture (:171-180) withMeshAddress:TestDeploy_FilesOnDeviceCommitsBothMachinesDeviceFirst(fake clan records the two apply calls in order + the front-door LiveSet's mesh target),TestDeploy_DeviceRouteReSuppliesPublicKanidmBlock,TestDeployTakeover_EnrollTargetIsTheMeshAddress,TestRemoval_DetachDropsRouteAndRedeploysGateway.Step 2: Run
go test ./internal/provision -run 'FilesOnDevice|MeshAddress|Removal' -v→ FAIL.Step 3: Implement; keep the gateway co-host tests (
deploy_test.go:543-703) green byte-identical.Step 4: Run the package → PASS;
go test ./...→ PASS.Step 5: Commit —
git commit -m "rehearsal-5: placement deploy — device closure + gateway mesh route, device-first two-node apply (ADR 0209) (task 6 of #<ticket>)".Global Constraints (from the plan)
failure is a named error, never a masked success. No sandbox-green claim (#377).
at P4-S3x; the takeover runs at provisioning's first deploy, never at join.
commit, then two single-node
clan.Deploycalls, device first (ruling: aroute to a dead service is the honest failure, a service with no route is
invisible).
test-results/standing-rented/; staleness gate =oc_bootstrap_stalenesspattern overagent/ go.mod go.sum internal/; thereaper stays honest — renewal, not exemption (
idss-rental-holdis forhumans, the executor never sets it).
#721/#722 (workstation) keep running; the prefix extraction (Task 10) is
behavior-preserving and #720 must stay green across it. Never touch the
executors' env files from a ticket.
POST/DELETE /issues/<n>/labels, never in anissue PATCH. "closes #NNN" in commit messages auto-closes — say "task N of
#NNN" instead.
git ls-tree origin/main docs/adr/at mint (IDIP + observability swarm lanes are minting concurrently).
git pull --rebaseimmediately before a STATUS commit (shared checkout).gofmt,go vet ./...,go test ./...green; TS:pnpm -r typecheck+unit suites green, pre-land.
journey.device.spec.ts+ device-add fixturesADR numbers ruled at mint — read 0207 → 0208, 0208 → 0209, 0209 → 0210
Task 1 (#842) has landed the phase-5 design tier. This ticket's body carries the
plan's assumed ADR numbers; they shifted by one at mint, exactly as the
Global Constraints line in your body told you to re-check.
/getWhy:
docs/adr/0207-design-keri-stack-version-pins.md(#771, the concurrentIDIP lane) had taken 0207 on
origin/mainbefore this arc minted.Use the ruled numbers in your commit messages and code comments. The plan
(
docs/superpowers/plans/2026-08-25-183-phase-5-device-nextcloud-rehearsal.md)is updated and records the mapping; commit
70a3bce6.Ruled by agent under ADR 0174 — veto anytime.
swarm-claim host=elitebook-distributed-server-03 run=10103
(automated multi-host claim — lowest live claim id works this ticket)
close-report for #847 — status
success✅ close-report gates passed — every claim verified against main; issue closed.
envelope