rehearsal phase 4 REGRESSION (2026-09-04): the rented-gateway journey still lands 20/20 — fires after the phase-3 regression #1226

Closed
opened 2026-09-04 21:26:56 +00:00 by ben · 3 comments
Owner

Regression drive, not a frontier — Ben's instruction 2026-09-04: run the phase 2 → 6 drive regressions (phase 2 droplet, phase 3 self-hosted, phase 4 rented, phase 5 device, and the full IDIP journey — no phase-6 artifact exists in the tree, the number is reserved; the IDIP journey is the un-numbered lane between 5 and 7).

Since the last greens the shared substrate moved: the whole phase-7 VM-mode device arc (#1157–#1165, #1200, #1210, #1214–#1220 — ADR 0223 + amendments, the netbird relay/management lockstep to 0.72.3, NB_DISABLE_GEOLOCATION, the guest content-keyed payload slot, RemoveNode deleting machines/<n>/, RemoveDevice revoking the grant for real, the standing agent's 30 s guard and the origin-carrying unit), the freshness-tax landings (ADR 0208 ruling 3a re-supply, the rebuild park, the snapshot rail, the executor self-nudge b5581d13/a70edd95), #1216 fleet projection reading the guest dedication, #1211 brand-kit apply, #1213 archive API key, the IDIP credentials tail (#1078–#1087, ADR 0222 wiring #1104/#1155/#1156) and FACTORY_REF → 1ff3485. None of it was meant to touch this path — a red here is a REGRESSION and its defect ticket names the commit. A preflight staleness park on the served get.idss.nz pin (#918 class) is NOT a regression: dispatch the reseed rail.

Executor contract unchanged (GREEN is the only close; a red files its defect and blocks this issue; the drive re-fires when the last blocker closes; every red's screenshots get eyeballed before a green is believed). Driven through the standing-drive queue (REHEARSAL_DRIVE_QUEUE, docs/operator-app/rehearsal-drive.md "The drive queue + confirmation loop"): the markers below name this issue's target and how many consecutive GREENs close it.

Phase 4 last closed GREEN on #1053 (drive 20260831T061743Z, 20/20 — the first rented drive from the workstation, on the fixed smoke-private-path.sh, GOTCHAS #139). The gateway-image auto-rebuild (#661/#1050, rebased on the previous golden snapshot per #1102/#1108) rebuilds idss-gateway-<sha> here if origin/main moved the agent paths; a FAILED rebuild now PARKS (GOTCHAS #162) instead of driving — a park is not a regression, read the drive-issue comment it leaves. preflight-ssh-key.sh names the DO key gap at second 0 if the host's key is missing (#856).

Close condition

One GREEN drive, 20/20 by leg list, screenshots eyeballed (rent-fails-clean … enroll-activate … founded → heartbeat-repoint → release).

Host: matou-workstation, queued after the phase-3 regression and blocked by it. This drive rents on the workstation's own slug (rehearsal-b); elitebook-03 keeps the standing community rehearsal-e for the phase-5 regression — never point two executors at one issue (GOTCHAS).

Regression drive, not a frontier — Ben's instruction 2026-09-04: run the phase 2 → 6 drive regressions (phase 2 droplet, phase 3 self-hosted, phase 4 rented, phase 5 device, and the full IDIP journey — no phase-6 artifact exists in the tree, the number is reserved; the IDIP journey is the un-numbered lane between 5 and 7). Since the last greens the shared substrate moved: the whole phase-7 VM-mode device arc (#1157–#1165, #1200, #1210, #1214–#1220 — ADR 0223 + amendments, the netbird relay/management lockstep to 0.72.3, `NB_DISABLE_GEOLOCATION`, the guest content-keyed payload slot, `RemoveNode` deleting `machines/<n>/`, `RemoveDevice` revoking the grant for real, the standing agent's 30 s guard and the origin-carrying unit), the freshness-tax landings (ADR 0208 ruling 3a re-supply, the rebuild park, the snapshot rail, the executor self-nudge `b5581d13`/`a70edd95`), #1216 fleet projection reading the guest dedication, #1211 brand-kit apply, #1213 archive API key, the IDIP credentials tail (#1078–#1087, ADR 0222 wiring #1104/#1155/#1156) and `FACTORY_REF` → `1ff3485`. None of it was meant to touch this path — a red here is a REGRESSION and its defect ticket names the commit. A preflight staleness park on the served `get.idss.nz` pin (#918 class) is NOT a regression: dispatch the reseed rail. Executor contract unchanged (GREEN is the only close; a red files its defect and blocks this issue; the drive re-fires when the last blocker closes; every red's screenshots get eyeballed before a green is believed). Driven through the standing-drive **queue** (`REHEARSAL_DRIVE_QUEUE`, `docs/operator-app/rehearsal-drive.md` "The drive queue + confirmation loop"): the markers below name this issue's target and how many consecutive GREENs close it. Phase 4 last closed GREEN on #1053 (drive `20260831T061743Z`, 20/20 — the first rented drive from the workstation, on the fixed `smoke-private-path.sh`, GOTCHAS #139). The gateway-image auto-rebuild (#661/#1050, rebased on the previous golden snapshot per #1102/#1108) rebuilds `idss-gateway-<sha>` here if origin/main moved the agent paths; a FAILED rebuild now PARKS (GOTCHAS #162) instead of driving — a park is not a regression, read the drive-issue comment it leaves. `preflight-ssh-key.sh` names the DO key gap at second 0 if the host's key is missing (#856). ## Close condition **One GREEN drive, 20/20 by leg list, screenshots eyeballed** (`rent-fails-clean … enroll-activate … founded → heartbeat-repoint → release`). Host: **matou-workstation**, queued after the phase-3 regression and **blocked by it**. This drive rents on the workstation's own slug (`rehearsal-b`); elitebook-03 keeps the standing community `rehearsal-e` for the phase-5 regression — never point two executors at one issue (GOTCHAS). <!-- rehearsal-target: rented --> <!-- rehearsal-confirm: 1 -->

gateway-image: snapshot advanced 15f494e → 0b07e27f101a by matou-dev-server-01 (#661 auto-rebuild — build.sh resolved the newest published agent ancestor, #654). The rented drive now boots current agent bits; no human build.sh run was needed. Rebuild timings: total 13m38s (provision 1m30s, nixos-install 1m55s, installer-base 8m14s, snapshot 1m35s) (#1139).

gateway-image: snapshot advanced `15f494e` → `0b07e27f101a` by matou-dev-server-01 (#661 auto-rebuild — build.sh resolved the newest published agent ancestor, #654). The rented drive now boots current agent bits; no human build.sh run was needed. Rebuild timings: total 13m38s (provision 1m30s, nixos-install 1m55s, installer-base 8m14s, snapshot 1m35s) (#1139).

drive 20260904T223330Z GREEN end to end — evidence (legs.json, durations, trace, host facts) in test-results/drive-rented/20260904T223330Z/ on the executor host; a representative screenshot is attached here if one was captured (#596). Closing per the standing instructions: the rented journey passes, #183 is ready to be boring.

drive `20260904T223330Z` GREEN end to end — evidence (legs.json, durations, trace, host facts) in `test-results/drive-rented/20260904T223330Z/` on the executor host; a representative screenshot is attached here if one was captured (#596). Closing per the standing instructions: the rented journey passes, #183 is ready to be boring.
Author
Owner

Leg-list verification (regression run 2026-09-04): run 20260904T223330Z is a TRUE green — 20/20, the SAME 20 legs in the same order as #1053's 20260831T061743Z (rent-fails-clean 76s → wizard-rent 52s → … → enroll-activate 229s → … → founded → heartbeat-repoint 11s → release 3s), real durations, 9.3 min wall, commit 0b07e27f, on the #661 auto-rebuilt 0b07e27f gateway snapshot (rebuilt in ~15 min, no hand build.sh). Screenshots eyeballed: founded.png = "Rehearsal B is alive." hand-off with the portal link, no status banner; release.png same screen post-release, and rehearsal-b.idss.nz no longer answers (rental released — no leaked box). Close stands; #1227 (IDIP, 41-leg bar) is driving.

**Leg-list verification (regression run 2026-09-04):** run `20260904T223330Z` is a TRUE green — 20/20, the SAME 20 legs in the same order as #1053's `20260831T061743Z` (`rent-fails-clean 76s → wizard-rent 52s → … → enroll-activate 229s → … → founded → heartbeat-repoint 11s → release 3s`), real durations, 9.3 min wall, commit `0b07e27f`, on the #661 auto-rebuilt `0b07e27f` gateway snapshot (rebuilt in ~15 min, no hand build.sh). Screenshots eyeballed: `founded.png` = "Rehearsal B is alive." hand-off with the portal link, no status banner; `release.png` same screen post-release, and `rehearsal-b.idss.nz` no longer answers (rental released — no leaked box). Close stands; #1227 (IDIP, 41-leg bar) is driving.
Sign in to join this conversation.
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
Matou/idss#1226
No description provided.