rehearsal: snapshot-advance comments carry per-phase rebuild timings; arc-start checklist walks fixed costs #1139
Labels
No labels
agent-blocked
agent-working
autopilot
bug
deferred
deploy-pending
enhancement
landing-pr
model-haiku
model-opus
model-sonnet
needs-design
needs-info
needs-triage
no-triage
out-of-scope
priority
ready-for-agent
ready-for-human
ready-for-session
rehearsal-183
snapshot-pending
standing-drive
wayfinder:grilling
wayfinder:map
wayfinder:prototype
wayfinder:research
wayfinder:task
wontfix
No milestone
No project
No assignees
2 participants
Notifications
Due date
No due date set.
Dependencies
No dependencies set.
Reference
Matou/idss#1139
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Why (from the #854 phase-5 retrospective)
91 of the arc's 112 gateway-image rebuilds ran at the old ~60-minute cost; the 15-minute rebased image (#1102 ruling B, #1108) landed 36 h before green. The cost was invisible for a week because nothing surfaced per-rebuild timings where anyone looks. The instrumentation now exists (
test-results/drive-device/gateway-image-rebuild.logrecords per-phase timings since #1108) — it just never reaches the tracker.What
docs/PROCESS.md, drive-arc section, arc-start checklist gains one line: "walk every fixed cost the loop will pay per cycle; any recurring step >30 min is a ticket on day one, not a tax."Acceptance
total XXmYYsplus the four phase timings.timings unavailable), never blocks the advance.Evidence: phase-5 report — rebuild tax ~95 h background compute, 60 min → 15 min only in the final 36 h.
swarm-claim host=matou-dev-server-01 run=16334
(automated multi-host claim — lowest live claim id works this ticket)
close-report for #1139 — status
success✅ close-report gates passed — every claim verified against main; issue closed.
envelope