rehearsal phase 3 REGRESSION (2026-09-04): the self-hosted journey still provisions and signs in (20/20) — fires after the phase-2 regression #1225

Closed
opened 2026-09-04 21:26:51 +00:00 by ben · 2 comments
Owner

Regression drive, not a frontier — Ben's instruction 2026-09-04: run the phase 2 → 6 drive regressions (phase 2 droplet, phase 3 self-hosted, phase 4 rented, phase 5 device, and the full IDIP journey — no phase-6 artifact exists in the tree, the number is reserved; the IDIP journey is the un-numbered lane between 5 and 7).

Since the last greens the shared substrate moved: the whole phase-7 VM-mode device arc (#1157–#1165, #1200, #1210, #1214–#1220 — ADR 0223 + amendments, the netbird relay/management lockstep to 0.72.3, NB_DISABLE_GEOLOCATION, the guest content-keyed payload slot, RemoveNode deleting machines/<n>/, RemoveDevice revoking the grant for real, the standing agent's 30 s guard and the origin-carrying unit), the freshness-tax landings (ADR 0208 ruling 3a re-supply, the rebuild park, the snapshot rail, the executor self-nudge b5581d13/a70edd95), #1216 fleet projection reading the guest dedication, #1211 brand-kit apply, #1213 archive API key, the IDIP credentials tail (#1078–#1087, ADR 0222 wiring #1104/#1155/#1156) and FACTORY_REF → 1ff3485. None of it was meant to touch this path — a red here is a REGRESSION and its defect ticket names the commit. A preflight staleness park on the served get.idss.nz pin (#918 class) is NOT a regression: dispatch the reseed rail.

Executor contract unchanged (GREEN is the only close; a red files its defect and blocks this issue; the drive re-fires when the last blocker closes; every red's screenshots get eyeballed before a green is believed). Driven through the standing-drive queue (REHEARSAL_DRIVE_QUEUE, docs/operator-app/rehearsal-drive.md "The drive queue + confirmation loop"): the markers below name this issue's target and how many consecutive GREENs close it.

Phase 3 last closed GREEN on #1052 (drive 20260831T051702Z, 20/20, leg list identical to the 08-25 green; deploy-takeover 426 s). #1052's hand-off screen carried a yellow founding: the stand-up is not at the reachability test status banner — check whether this drive's frame still shows it.

Close condition

One GREEN drive, 20/20 by leg list (the same 20 legs, in order, real durations), screenshots eyeballed (same bar as #657/#721/#1052).

Host: matou-workstation, queued after the phase-2 regression and blocked by it so the two run one after the other. The selfhosted preflight gates on the served get.idss.nz pin (#918) — a staleness park is not a regression; dispatch the reseed rail.

Regression drive, not a frontier — Ben's instruction 2026-09-04: run the phase 2 → 6 drive regressions (phase 2 droplet, phase 3 self-hosted, phase 4 rented, phase 5 device, and the full IDIP journey — no phase-6 artifact exists in the tree, the number is reserved; the IDIP journey is the un-numbered lane between 5 and 7). Since the last greens the shared substrate moved: the whole phase-7 VM-mode device arc (#1157–#1165, #1200, #1210, #1214–#1220 — ADR 0223 + amendments, the netbird relay/management lockstep to 0.72.3, `NB_DISABLE_GEOLOCATION`, the guest content-keyed payload slot, `RemoveNode` deleting `machines/<n>/`, `RemoveDevice` revoking the grant for real, the standing agent's 30 s guard and the origin-carrying unit), the freshness-tax landings (ADR 0208 ruling 3a re-supply, the rebuild park, the snapshot rail, the executor self-nudge `b5581d13`/`a70edd95`), #1216 fleet projection reading the guest dedication, #1211 brand-kit apply, #1213 archive API key, the IDIP credentials tail (#1078–#1087, ADR 0222 wiring #1104/#1155/#1156) and `FACTORY_REF` → `1ff3485`. None of it was meant to touch this path — a red here is a REGRESSION and its defect ticket names the commit. A preflight staleness park on the served `get.idss.nz` pin (#918 class) is NOT a regression: dispatch the reseed rail. Executor contract unchanged (GREEN is the only close; a red files its defect and blocks this issue; the drive re-fires when the last blocker closes; every red's screenshots get eyeballed before a green is believed). Driven through the standing-drive **queue** (`REHEARSAL_DRIVE_QUEUE`, `docs/operator-app/rehearsal-drive.md` "The drive queue + confirmation loop"): the markers below name this issue's target and how many consecutive GREENs close it. Phase 3 last closed GREEN on #1052 (drive `20260831T051702Z`, 20/20, leg list identical to the 08-25 green; deploy-takeover 426 s). #1052's hand-off screen carried a yellow `founding: the stand-up is not at the reachability test` status banner — check whether this drive's frame still shows it. ## Close condition **One GREEN drive, 20/20 by leg list (the same 20 legs, in order, real durations), screenshots eyeballed** (same bar as #657/#721/#1052). Host: **matou-workstation**, queued after the phase-2 regression and **blocked by it** so the two run one after the other. The selfhosted preflight gates on the served `get.idss.nz` pin (#918) — a staleness park is not a regression; dispatch the reseed rail. <!-- rehearsal-target: selfhosted --> <!-- rehearsal-confirm: 1 -->

drive 20260904T222012Z GREEN end to end — evidence (legs.json, durations, trace, host facts) in test-results/drive-selfhosted/20260904T222012Z/ on the executor host; a representative screenshot is attached here if one was captured (#596). Closing per the standing instructions: the selfhosted journey passes, #183 is ready to be boring.

drive `20260904T222012Z` GREEN end to end — evidence (legs.json, durations, trace, host facts) in `test-results/drive-selfhosted/20260904T222012Z/` on the executor host; a representative screenshot is attached here if one was captured (#596). Closing per the standing instructions: the selfhosted journey passes, #183 is ready to be boring.
Author
Owner

Leg-list verification (regression run 2026-09-04): run 20260904T222012Z is a TRUE green — 20/20, the SAME 20 legs in the same order as #1052's 20260831T051702Z, real durations (deploy-takeover 406 s vs 426 s, deploy-files 171 s, oidc-admin 8 s, heartbeat-repoint 6 s), 10.6 min wall, commit 0b07e27f. Screenshots eyeballed: oidc-admin-w2.png = Nextcloud admin Background-jobs settings behind the first-run modal (operator IS admin). founded.png STILL shows the yellow founding: the stand-up is not at the reachability test status banner on the hand-off screen — identical to #1052's 08-31 frame, so pre-existing and not a regression of this window; still worth Ben's glance (unticketed as far as I can see). Close stands; #1226 (phase 4) is driving on the auto-rebuilt 0b07e27f gateway snapshot.

**Leg-list verification (regression run 2026-09-04):** run `20260904T222012Z` is a TRUE green — 20/20, the SAME 20 legs in the same order as #1052's `20260831T051702Z`, real durations (deploy-takeover 406 s vs 426 s, deploy-files 171 s, oidc-admin 8 s, heartbeat-repoint 6 s), 10.6 min wall, commit `0b07e27f`. Screenshots eyeballed: `oidc-admin-w2.png` = Nextcloud admin Background-jobs settings behind the first-run modal (operator IS admin). `founded.png` STILL shows the yellow `founding: the stand-up is not at the reachability test` status banner on the hand-off screen — identical to #1052's 08-31 frame, so pre-existing and not a regression of this window; still worth Ben's glance (unticketed as far as I can see). Close stands; #1226 (phase 4) is driving on the auto-rebuilt `0b07e27f` gateway snapshot.
Sign in to join this conversation.
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
Matou/idss#1225
No description provided.