rehearsal phase 3 REGRESSION (2026-08-30): the self-hosted journey still provisions and signs in (20/20) — fires after the phase-2 regression #1052
Labels
No labels
agent-blocked
agent-working
autopilot
bug
deferred
deploy-pending
enhancement
landing-pr
model-haiku
model-opus
model-sonnet
needs-design
needs-info
needs-triage
no-triage
out-of-scope
priority
ready-for-agent
ready-for-human
ready-for-session
rehearsal-183
snapshot-pending
standing-drive
wayfinder:grilling
wayfinder:map
wayfinder:prototype
wayfinder:research
wayfinder:task
wontfix
No milestone
No project
No assignees
2 participants
Notifications
Due date
No due date set.
Blocks
Depends on
Reference
Matou/idss#1052
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Regression drive, not a frontier — Ben's instruction 2026-08-30: run drives 2, 3, 4 and the IDIP regression one after another. Phase 3 last closed GREEN on #721 (self-hosted journey, drive
20260825T013049Z, 20/20).Since those greens the shared substrate moved: the IDIP arc (#954/#966/#968/#985 — ADR 0197/0209/0214/0215, the netbird management plane on the gateway, IDIP mints no kanidm token), the Tier-3 installer-base chain (#1016→#1050, ADR 0133 amended; the closure now baked into the gateway golden snapshot, gateway-image auto-rebuild keyed on the installer-base out path), the #992/#1009 enroll-activate watchdog, #1007 deploy-key trust, #998 gateway self-admit, the #1035 preflight backoff and the offline eval gate. None of it was meant to touch this path — a red here is a REGRESSION and its defect ticket names the commit.
Close condition
One GREEN drive, 20/20, verified by leg list, screenshots eyeballed (same bar as #657/#721).
Executor contract unchanged (GREEN is the only close; a red files its defect and blocks this issue; the drive re-fires when the last blocker closes; every red's screenshots get eyeballed before a green is believed). Driven through the standing-drive queue (
REHEARSAL_DRIVE_QUEUE,docs/operator-app/rehearsal-drive.md"The drive queue + confirmation loop"): the markers below name this issue's target and how many consecutive GREENs close it.Host: matou-workstation, queued after the phase-2 regression and blocked by it so the two run one after the other. The selfhosted preflight gates on the served
get.idss.nzpin (#918) — a staleness park is not a regression; dispatch the reseed rail.drive
20260831T051702ZGREEN end to end — evidence (legs.json, durations, trace, host facts) intest-results/drive-selfhosted/20260831T051702Z/on the executor host; a representative screenshot is attached here if one was captured (#596). Closing per the standing instructions: the selfhosted journey passes, #183 is ready to be boring.Verified by leg list (agent, 2026-08-31): drive
20260831T051702Z— 20/20, identical leg list to the 08-25 green (#721), real durations (deploy-takeover426s,oidc-admin7s). Screenshots eyeballed by the agent (hand-off onrehearsal-b.idss.nz, Nextcloud admin settings via OIDC); Ben's pass pending. One glance-worthy item: the hand-off screen carried the yellow status bannerfounding: the stand-up is not at the reachability test(informational — the leg greened).