rehearsal phase 3 REGRESSION (2026-08-30): the self-hosted journey still provisions and signs in (20/20) — fires after the phase-2 regression #1052

Closed
opened 2026-08-31 03:59:08 +00:00 by ben · 2 comments
Owner

Regression drive, not a frontier — Ben's instruction 2026-08-30: run drives 2, 3, 4 and the IDIP regression one after another. Phase 3 last closed GREEN on #721 (self-hosted journey, drive 20260825T013049Z, 20/20).

Since those greens the shared substrate moved: the IDIP arc (#954/#966/#968/#985 — ADR 0197/0209/0214/0215, the netbird management plane on the gateway, IDIP mints no kanidm token), the Tier-3 installer-base chain (#1016→#1050, ADR 0133 amended; the closure now baked into the gateway golden snapshot, gateway-image auto-rebuild keyed on the installer-base out path), the #992/#1009 enroll-activate watchdog, #1007 deploy-key trust, #998 gateway self-admit, the #1035 preflight backoff and the offline eval gate. None of it was meant to touch this path — a red here is a REGRESSION and its defect ticket names the commit.

Close condition

One GREEN drive, 20/20, verified by leg list, screenshots eyeballed (same bar as #657/#721).

Executor contract unchanged (GREEN is the only close; a red files its defect and blocks this issue; the drive re-fires when the last blocker closes; every red's screenshots get eyeballed before a green is believed). Driven through the standing-drive queue (REHEARSAL_DRIVE_QUEUE, docs/operator-app/rehearsal-drive.md "The drive queue + confirmation loop"): the markers below name this issue's target and how many consecutive GREENs close it.

Host: matou-workstation, queued after the phase-2 regression and blocked by it so the two run one after the other. The selfhosted preflight gates on the served get.idss.nz pin (#918) — a staleness park is not a regression; dispatch the reseed rail.

Regression drive, not a frontier — Ben's instruction 2026-08-30: run drives 2, 3, 4 and the IDIP regression one after another. Phase 3 last closed GREEN on #721 (self-hosted journey, drive `20260825T013049Z`, 20/20). Since those greens the shared substrate moved: the IDIP arc (#954/#966/#968/#985 — ADR 0197/0209/0214/0215, the netbird management plane on the gateway, IDIP mints no kanidm token), the Tier-3 installer-base chain (#1016→#1050, ADR 0133 amended; the closure now baked into the gateway golden snapshot, gateway-image auto-rebuild keyed on the installer-base out path), the #992/#1009 enroll-activate watchdog, #1007 deploy-key trust, #998 gateway self-admit, the #1035 preflight backoff and the offline eval gate. None of it was meant to touch this path — a red here is a REGRESSION and its defect ticket names the commit. ## Close condition **One GREEN drive, 20/20, verified by leg list, screenshots eyeballed** (same bar as #657/#721). Executor contract unchanged (GREEN is the only close; a red files its defect and blocks this issue; the drive re-fires when the last blocker closes; every red's screenshots get eyeballed before a green is believed). Driven through the standing-drive **queue** (`REHEARSAL_DRIVE_QUEUE`, `docs/operator-app/rehearsal-drive.md` "The drive queue + confirmation loop"): the markers below name this issue's target and how many consecutive GREENs close it. Host: **matou-workstation**, queued after the phase-2 regression and **blocked by it** so the two run one after the other. The selfhosted preflight gates on the served `get.idss.nz` pin (#918) — a staleness park is not a regression; dispatch the reseed rail. <!-- rehearsal-target: selfhosted --> <!-- rehearsal-confirm: 1 -->

drive 20260831T051702Z GREEN end to end — evidence (legs.json, durations, trace, host facts) in test-results/drive-selfhosted/20260831T051702Z/ on the executor host; a representative screenshot is attached here if one was captured (#596). Closing per the standing instructions: the selfhosted journey passes, #183 is ready to be boring.

drive `20260831T051702Z` GREEN end to end — evidence (legs.json, durations, trace, host facts) in `test-results/drive-selfhosted/20260831T051702Z/` on the executor host; a representative screenshot is attached here if one was captured (#596). Closing per the standing instructions: the selfhosted journey passes, #183 is ready to be boring.
Author
Owner

Verified by leg list (agent, 2026-08-31): drive 20260831T051702Z — 20/20, identical leg list to the 08-25 green (#721), real durations (deploy-takeover 426s, oidc-admin 7s). Screenshots eyeballed by the agent (hand-off on rehearsal-b.idss.nz, Nextcloud admin settings via OIDC); Ben's pass pending. One glance-worthy item: the hand-off screen carried the yellow status banner founding: the stand-up is not at the reachability test (informational — the leg greened).

Verified by leg list (agent, 2026-08-31): drive `20260831T051702Z` — 20/20, identical leg list to the 08-25 green (#721), real durations (`deploy-takeover` 426s, `oidc-admin` 7s). Screenshots eyeballed by the agent (hand-off on `rehearsal-b.idss.nz`, Nextcloud admin settings via OIDC); Ben's pass pending. One glance-worthy item: the hand-off screen carried the yellow status banner `founding: the stand-up is not at the reachability test` (informational — the leg greened).
Sign in to join this conversation.
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.