rehearsal phase 2 REGRESSION (2026-08-30): the takeover-droplet journey still founds and provisions Nextcloud at the real door — first of four queued drives #1051

Closed
opened 2026-08-31 03:59:06 +00:00 by ben · 3 comments
Owner

Regression drive, not a frontier — Ben's instruction 2026-08-30: run drives 2, 3, 4 and the IDIP regression one after another. Phase 2 last closed GREEN on #722 (drive 20260826T203110Z, 25 green / 0 red / 3 skip, invite-member green for the first time; the 3 skips are the known own-VPS frontier rows alert-email / rescue-rung / backup-honest-floor).

Since those greens the shared substrate moved: the IDIP arc (#954/#966/#968/#985 — ADR 0197/0209/0214/0215, the netbird management plane on the gateway, IDIP mints no kanidm token), the Tier-3 installer-base chain (#1016→#1050, ADR 0133 amended; the closure now baked into the gateway golden snapshot, gateway-image auto-rebuild keyed on the installer-base out path), the #992/#1009 enroll-activate watchdog, #1007 deploy-key trust, #998 gateway self-admit, the #1035 preflight backoff and the offline eval gate. None of it was meant to touch this path — a red here is a REGRESSION and its defect ticket names the commit.

Close condition

One GREEN drive, every leg that runs green, verified by LEG LIST (not the verdict count — a moved leg total is the false-green signature), screenshots eyeballed.

Executor contract unchanged (GREEN is the only close; a red files its defect and blocks this issue; the drive re-fires when the last blocker closes; every red's screenshots get eyeballed before a green is believed). Driven through the standing-drive queue (REHEARSAL_DRIVE_QUEUE, docs/operator-app/rehearsal-drive.md "The drive queue + confirmation loop"): the markers below name this issue's target and how many consecutive GREENs close it.

Host: matou-workstation (REHEARSAL_DRIVE_QUEUE head — phase 2 → phase 3 → phase 4 → IDIP, one executor, one after another).

Regression drive, not a frontier — Ben's instruction 2026-08-30: run drives 2, 3, 4 and the IDIP regression one after another. Phase 2 last closed GREEN on #722 (drive `20260826T203110Z`, 25 green / 0 red / 3 skip, `invite-member` green for the first time; the 3 skips are the known own-VPS frontier rows `alert-email` / `rescue-rung` / `backup-honest-floor`). Since those greens the shared substrate moved: the IDIP arc (#954/#966/#968/#985 — ADR 0197/0209/0214/0215, the netbird management plane on the gateway, IDIP mints no kanidm token), the Tier-3 installer-base chain (#1016→#1050, ADR 0133 amended; the closure now baked into the gateway golden snapshot, gateway-image auto-rebuild keyed on the installer-base out path), the #992/#1009 enroll-activate watchdog, #1007 deploy-key trust, #998 gateway self-admit, the #1035 preflight backoff and the offline eval gate. None of it was meant to touch this path — a red here is a REGRESSION and its defect ticket names the commit. ## Close condition **One GREEN drive, every leg that runs green, verified by LEG LIST (not the verdict count — a moved leg total is the false-green signature), screenshots eyeballed.** Executor contract unchanged (GREEN is the only close; a red files its defect and blocks this issue; the drive re-fires when the last blocker closes; every red's screenshots get eyeballed before a green is believed). Driven through the standing-drive **queue** (`REHEARSAL_DRIVE_QUEUE`, `docs/operator-app/rehearsal-drive.md` "The drive queue + confirmation loop"): the markers below name this issue's target and how many consecutive GREENs close it. Host: **matou-workstation** (`REHEARSAL_DRIVE_QUEUE` head — phase 2 → phase 3 → phase 4 → IDIP, one executor, one after another). <!-- rehearsal-target: droplet --> <!-- rehearsal-confirm: 1 -->

drive 20260831T042600Z RED — now blocked by: #1056 (evidence on each). The drive re-fires when the last blocker closes.

drive `20260831T042600Z` RED — now blocked by: #1056 (evidence on each). The drive re-fires when the last blocker closes.

drive 20260831T050159Z GREEN end to end — evidence (legs.json, durations, trace, host facts) in test-results/drive-droplet/20260831T050159Z/ on the executor host; a representative screenshot is attached here if one was captured (#596). Closing per the standing instructions: the droplet journey passes, #183 is ready to be boring.

drive `20260831T050159Z` GREEN end to end — evidence (legs.json, durations, trace, host facts) in `test-results/drive-droplet/20260831T050159Z/` on the executor host; a representative screenshot is attached here if one was captured (#596). Closing per the standing instructions: the droplet journey passes, #183 is ready to be boring.
Author
Owner

Verified by leg list (agent, 2026-08-31): drive 20260831T050159Z carries the identical 28-row list to the 08-26 green (#722) — 25 green / 3 own-VPS frontier skips (backup-honest-floor, alert-email, rescue-rung), real durations (enroll-configure 285s, deploy-files 170s, invite-member 17s). Gateway journal 05:09:20: idss-mesh-self-admit: the gateway's own peer joined its mesh plane on wt0 — the #1056 fix proven live. Screenshots eyeballed by the agent (hand-off, branded Nextcloud dashboard, admin Basic settings under oidc-admin, member welcome dialog under invite-member); Ben's eyeball pass pending. The first drive's red (042600Z) was a TRUE regression from #998 — see #1056 / GOTCHAS #138.

Verified by leg list (agent, 2026-08-31): drive `20260831T050159Z` carries the identical 28-row list to the 08-26 green (#722) — 25 green / 3 own-VPS frontier skips (`backup-honest-floor`, `alert-email`, `rescue-rung`), real durations (`enroll-configure` 285s, `deploy-files` 170s, `invite-member` 17s). Gateway journal 05:09:20: `idss-mesh-self-admit: the gateway's own peer joined its mesh plane on wt0` — the #1056 fix proven live. Screenshots eyeballed by the agent (hand-off, branded Nextcloud dashboard, admin Basic settings under `oidc-admin`, member welcome dialog under `invite-member`); Ben's eyeball pass pending. The first drive's red (`042600Z`) was a TRUE regression from #998 — see #1056 / GOTCHAS #138.
Sign in to join this conversation.
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
Matou/idss#1051
No description provided.