Vendor the scheduler-silence canary into idss — FACTORY_REF bump to dev-factory 8ea613a (closes #269) #891
Labels
No labels
agent-blocked
agent-working
autopilot
bug
deferred
deploy-pending
enhancement
landing-pr
model-haiku
model-opus
model-sonnet
needs-design
needs-info
needs-triage
no-triage
out-of-scope
priority
ready-for-agent
ready-for-human
ready-for-session
rehearsal-183
snapshot-pending
standing-drive
wayfinder:grilling
wayfinder:map
wayfinder:prototype
wayfinder:research
wayfinder:task
wontfix
No milestone
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set.
Reference
Matou/idss#891
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Machinery change needed (protected path —
.sandcastle/)Found while working: #269 (scheduler-silence canary). Per Ben's ruling on
#269, the canary's canonical home is dev-factory (ADR 0180 / #571), beside the
schedule-backstop.shit mirrors, and #269 closes when the FACTORY_REF bumpvendors the canary into idss. That bump is a
.sandcastle/protected-pathchange (#445 / GOTCHAS 4), so a Sandcastle agent cannot make it — routing here
as
ready-for-sessionper ADR 0174 / Rule 9.Symptom
idss's vendored factory core is pinned at
.sandcastle/FACTORY_REF = e61aa000f77b7fa552ef32a03152045e587262a5, whichpredates the canary.
scheduler-canary.shdoes not exist at that ref, soidss has no detection for the two live scheduler-silence incidents on record
(2026-07-28 creation-drop; 2026-08-26 #878 claim-stall; GOTCHAS #95).
Fix (re-vendor / pin bump)
The execution ticket dev-factory #105 is CLOSED — commit
8ea613a83809f15a59f191021a2a3061be16e4b4(current dev-factorymainHEAD) addsscheduler-canary.sh,tests/scheduler-canary-test.sh, thebackstop-tick.sh/host-state-lib.shper-repo wiring, and GOTCHAS 34.Re-vendor idss from dev-factory (
onboard.sh vendor, the sanctioned path — donot hand-edit
.sandcastle/):.sandcastle/FACTORY_REF:e61aa00…→8ea613a…..sandcastle/FACTORY_MANIFEST):at minimum
scheduler-canary.shandtests/scheduler-canary-test.sh— so thehost crontab's per-repo
backstop-tickdrives idss's own vendored copy(dev-factory #105 AC3: "one canary per repo driving each repo's own vendored
copy"). Re-vendor any other files #105 touched that idss already vendors
(e.g.
schedule-backstop.shif it changed).bash .sandcastle/check-harness-drift.shis byte-clean against thenew pin, and
bash .sandcastle/tests/scheduler-canary-test.sh(cases (a)–(e))is green.
On landing
The vendor lands the canary in idss → close #269 (its stated closing
condition). #269 is parked
agent-blockedpending this.Refs: idss #269, dev-factory #105 (commit
8ea613a), ADR 0180, #445, GOTCHAS #95.Close-report — landed & proven (ADR 0174 / Rule 3).
Vendored the scheduler-silence canary into idss by bumping the factory pin, via the sanctioned
onboard.sh vendor(no hand-edit of the protected.sandcastle/path — #445 / GOTCHAS 4).What landed (commit
52e92e7f):.sandcastle/FACTORY_REF:e61aa000f77b7fa552ef32a03152045e587262a5→8ea613a83809f15a59f191021a2a3061be16e4b4(dev-factorymainHEAD, dev-factory #105).onboard.sh vendor .sandcastle 8ea613a— read dev-factory'svendor-manifestat the new ref, which now carriesscheduler-canary.shandpark-wiring-lib.sh.scheduler-canary.sh,tests/scheduler-canary-test.sh,park-wiring-lib.sh,tests/park-wiring-lib-test.sh,tests/run-swarm-limit-park-gate-test.sh.check-harness-drift.sh,heal.sh,host-capacity-lib.sh,preflight-swarm.sh,run-swarm.sh,run-triage.sh+ 7 tests.FACTORY_MANIFESTregenerated by the vendor.STATUS.md: new header lead + milestone-log entry (state-change in the same commit).So the host crontab's per-repo
backstop-ticknow drives idss's own vendoredscheduler-canary.sh(dev-factory #105 AC3: one canary per repo driving each repo's own vendored copy), giving idss detection for the two live scheduler-silence incidents on record (2026-07-28 creation-drop; 2026-08-26 #878 claim-stall; GOTCHAS #95).Proof:
bash .sandcastle/check-harness-drift.sh→OK — every vendored factory file matches …@8ea613a…(byte-clean against the new pin).bash .sandcastle/tests/scheduler-canary-test.sh→10 scenarios passed(cases (a) fresh-queue-silent, (b) saturated-once→de-bounced→recovered, (c) stale-head-ungated, (d) stale-head-claimed-silent, (e) API-down→exit 2).park-wiring-lib-test.sh(25 passed),check-harness-drift-test.sh(11 passed),host-capacity-lib-test.sh(21 groups passed).Ruled by agent under ADR 0174 — a revertible pin bump, provable by the drift check + canary test; veto anytime. Closing #891; closing #269 next (its stated vendor-in condition is met).