rehearsal-5 task 10/13: Rented-prefix extraction (behavior-preserving; #720 stays green) #851
Labels
No labels
agent-blocked
agent-working
autopilot
bug
deferred
deploy-pending
enhancement
landing-pr
model-haiku
model-opus
model-sonnet
needs-design
needs-info
needs-triage
no-triage
out-of-scope
priority
ready-for-agent
ready-for-human
ready-for-session
rehearsal-183
snapshot-pending
standing-drive
wayfinder:grilling
wayfinder:map
wayfinder:prototype
wayfinder:research
wayfinder:task
wontfix
No milestone
No project
No assignees
2 participants
Notifications
Due date
No due date set.
Blocks
Reference
Matou/idss#851
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Part of the #183 phase-5 rehearsal arc (device-add + Nextcloud-on-device on a standing rented community).
docs/superpowers/specs/2026-08-25-183-phase-5-device-nextcloud-rehearsal-design.mddocs/superpowers/plans/2026-08-25-183-phase-5-device-nextcloud-rehearsal.md— this ticket is Task 10, carried verbatim below. The plan's Global Constraints apply to every step.Task 10: Rented-prefix extraction (behavior-preserving; #720 stays green)
Files:
app/tests/e2e/fixtures/rentedPrefix.tsapp/tests/e2e/journey.rented.spec.ts(consumes the fixture; leg keys, budgets, assertions byte-identical)STATUS.mdInterfaces:
Consumes: the leg bodies currently inline in
journey.rented.spec.tslegswizard-rent → claim → create → image-boot → PAIR_FRONTIER → point → deploy → activation → founded(lines 416–660) —rent-fails-clean,heartbeat-repoint,releasestay spec-local.Produces:
Same leg keys, same ceilings (
CEILINGmoves into the fixture and is re-exported to the spec), samereadState()/foundingAddresssecret capture.Step 1: Extract — move the leg bodies verbatim; the spec's describe keeps its own state vars fed from the returned
RentedPrefixState.Step 2: Verify behavior-preserving —
pnpm --filter app exec playwright test --list journey.rented.spec.tslists one test;pnpm -r typecheckPASS;git diffshows NO leg-key, budget, or assertion string changed (review the diff for exactly this).Step 3: Commit —
git commit -m "rehearsal-5: extract the rented founding prefix into a fixture — journey.rented behavior-preserving (task 10 of #<ticket>)". Watch #720's next drive before building on this — a red here reverts first, asks questions second.Global Constraints (from the plan)
failure is a named error, never a masked success. No sandbox-green claim (#377).
at P4-S3x; the takeover runs at provisioning's first deploy, never at join.
commit, then two single-node
clan.Deploycalls, device first (ruling: aroute to a dead service is the honest failure, a service with no route is
invisible).
test-results/standing-rented/; staleness gate =oc_bootstrap_stalenesspattern overagent/ go.mod go.sum internal/; thereaper stays honest — renewal, not exemption (
idss-rental-holdis forhumans, the executor never sets it).
#721/#722 (workstation) keep running; the prefix extraction (Task 10) is
behavior-preserving and #720 must stay green across it. Never touch the
executors' env files from a ticket.
POST/DELETE /issues/<n>/labels, never in anissue PATCH. "closes #NNN" in commit messages auto-closes — say "task N of
#NNN" instead.
git ls-tree origin/main docs/adr/at mint (IDIP + observability swarm lanes are minting concurrently).
git pull --rebaseimmediately before a STATUS commit (shared checkout).gofmt,go vet ./...,go test ./...green; TS:pnpm -r typecheck+unit suites green, pre-land.
journey.device.spec.ts+ device-add fixturesswarm-claim host=elitebook-distributed-server-03 run=10096
(automated multi-host claim — lowest live claim id works this ticket)
close-report for #851 — status
success✅ close-report gates passed — every claim verified against main; issue closed.
envelope