founding: the deploy leg reds on a transient activation failure the guest self-heals from (VM sibling of #462) #476
Labels
No labels
agent-blocked
agent-working
autopilot
bug
deferred
deploy-pending
enhancement
landing-pr
model-haiku
model-opus
model-sonnet
needs-design
needs-info
needs-triage
no-triage
out-of-scope
priority
ready-for-agent
ready-for-human
ready-for-session
rehearsal-183
snapshot-pending
standing-drive
wayfinder:grilling
wayfinder:map
wayfinder:prototype
wayfinder:research
wayfinder:task
wontfix
No milestone
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set.
Reference
Matou/idss#476
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Filed from Ben's 2026-08-12 manual fresh-install trial (full Tier 1+2 reset: cold /nix, wiped community env, private path, tree at
35b387b).What happened
The stand-up's gateway deploy pushed the closure and ran activation on the guest. The guest journal shows:
nixos[1127]: switching to system configuration /nix/store/y0cp855...-nixos-system-gateway-... failed (status 4)(first switch attempt; accompanied byReload failed for D-Bus User/System Message Bus)nixos[1697]: finished switching to system configuration /nix/store/y0cp855...(second attempt SUCCEEDED);clan-switch-gateway-dad0a201.service: Deactivated successfullysshd: error: PAM: Authentication failure for root from 10.0.2.2(a post-deploy probe?); the same guest-trust key door worked fine seconds later and thereafterEnd state on the guest: zero failed units, ourcloud-control-plane and kanidm active, running exactly the deployed closure — yet the app declared "The gateway deploy failed" and offered VM deletion.
Why it matters
This is #462's defect class on the private path: a deploy hard-fails on a transient the system self-heals from, and here it pushed the operator toward destroying a healthy gateway. #462's fix keyed the own-VPS probe on UnitActive; the VM path's verification needs the same tolerance.
Definition of done
foundedflips true before the stand-up completes — resume skips the credential hand-off (S12 never ran) #484close-report for #476 — status
success✅ close-report gates passed — every claim verified against main; closing.
envelope
public-entry— the checklist row rests done UNCONDITIONALLY, nothing probes the public door (#499 part 1, Ben's ruling) #501