founding cutover: wire the founding PAGE into AppShell in place of FoundingWizard (delete v1) + re-point wizard.ts — the '2026-09-12 page IS the surface' premise #1447/#1450/#1451/#1452 assume #1455

Closed
opened 2026-09-12 16:45:47 +00:00 by matou-build-agent · 1 comment

What must land

The founding-page cutover that a whole batch of 2026-09-12 tickets already
assumes has happened, but which is not on origin/main (verified at
9e551291):

  1. Wire FoundingV2Page into AppShell in place of FoundingWizard.
    app/src/components/AppShell.vue:27 (import :87) still mounts
    FoundingWizard (v1) for route.name === 'founding'. FoundingV2Page.vue /
    FoundingV2Journey.vue are rendered only by the preview harness
    (app/tests/e2e/preview-harness/founding-v2.ts), never by the shipping app.
  2. Retire v1 per Ben's ruling 2026-09-12 ("no more v1/v2 in the code").
    FoundingV2Page.vue's own header still says "The v1 founding wizard is
    untouched — nothing is deleted until v2 is finished."
  3. Re-point app/tests/e2e/fixtures/wizard.ts at the page (last commit
    d9492bf7, still pure v1 order): welcomeToS1 → [data-action="start"],
    a walkToConfirm reaching [data-status="founding-confirm"], reviewAndCreate
    → [data-action="build"], plus servicesToAccess and s4dConnectOwnVPS.
    None of those symbols/hooks exist today (grep-empty).

Why it isn't ready yet (its own blockers)

The page is unfinished, so the cutover can't simply flip a switch. Missing from
app/src/lib/foundingStack.ts / the app:

  • No connect section in the walk at all (the own-VPS dial-out /
    self-hosted dial-in step several tickets place between the bench and Confirm).
  • No founding-confirm / founding-journey / connect-device /
    use-dial-in
    hooks; no page-level [data-action="build"] outside the
    preview page. Only pick-service exists.
  • Data layer is description-only briefs — add-device, roles,
    storage, backups have no screens; the walk can't reach a built Confirm.

These are the in-flight v2 arc: #1404 (release the broker claim on private),
#1413 / #1414 / #1416 / #1417 (seam + Go: connect / pre-check / build-the-whole-
plan), #1448 (S12 hand-off from the seam), #1449 (the page's UI-contract drive on
the preview harness). This cutover ticket depends on that arc landing first.

What it unblocks

The 2026-09-12 live-drive batch that all assert "the founding page IS the shell's
founding surface since 2026-09-12" while the app still boots the wizard:
#1447 (re-sequence the founding callers to the page's walk), #1450
(connect-before-check live drive), #1451 (two-machine build drive), #1452
(device-add CONNECT stage). Each is red-by-construction until this lands.

Why human

Sequencing + a member-facing trust call: when to flip the entire founding
experience to the new page and delete v1 (Ben's 2026-09-12 "no more v1/v2"
ruling), given the v2 arc above is still part needs-design. That's Ben's ruling,
not a two-way agent action — and it's the real residue behind the blocked
live-drive batch.

Filed by the #1447 session under ADR 0174 (rule 1: file follow-ups instead of
picking up out-of-scope work) — veto anytime.

## What must land The **founding-page cutover** that a whole batch of 2026-09-12 tickets already assumes has happened, but which is **not on `origin/main`** (verified at `9e551291`): 1. **Wire `FoundingV2Page` into `AppShell` in place of `FoundingWizard`.** `app/src/components/AppShell.vue:27` (import `:87`) still mounts `FoundingWizard` (v1) for `route.name === 'founding'`. `FoundingV2Page.vue` / `FoundingV2Journey.vue` are rendered **only** by the preview harness (`app/tests/e2e/preview-harness/founding-v2.ts`), never by the shipping app. 2. **Retire v1** per Ben's ruling 2026-09-12 ("no more v1/v2 in the code"). `FoundingV2Page.vue`'s own header still says *"The v1 founding wizard is untouched — nothing is deleted until v2 is finished."* 3. **Re-point `app/tests/e2e/fixtures/wizard.ts` at the page** (last commit `d9492bf7`, still pure v1 order): `welcomeToS1` → `[data-action="start"]`, a `walkToConfirm` reaching `[data-status="founding-confirm"]`, `reviewAndCreate` → `[data-action="build"]`, plus `servicesToAccess` and `s4dConnectOwnVPS`. None of those symbols/hooks exist today (grep-empty). ## Why it isn't ready yet (its own blockers) The page is unfinished, so the cutover can't simply flip a switch. Missing from `app/src/lib/foundingStack.ts` / the app: - **No `connect` section** in the walk at all (the own-VPS dial-out / self-hosted dial-in step several tickets place between the bench and Confirm). - **No `founding-confirm` / `founding-journey` / `connect-device` / `use-dial-in`** hooks; no page-level `[data-action="build"]` outside the preview page. Only `pick-service` exists. - **Data layer is `description`-only briefs** — `add-device`, `roles`, `storage`, `backups` have no screens; the walk can't reach a built Confirm. These are the in-flight v2 arc: #1404 (release the broker claim on private), #1413 / #1414 / #1416 / #1417 (seam + Go: connect / pre-check / build-the-whole- plan), #1448 (S12 hand-off from the seam), #1449 (the page's UI-contract drive on the preview harness). This cutover ticket depends on that arc landing first. ## What it unblocks The 2026-09-12 live-drive batch that all assert "the founding page IS the shell's founding surface since 2026-09-12" while the app still boots the wizard: **#1447** (re-sequence the founding callers to the page's walk), **#1450** (connect-before-check live drive), **#1451** (two-machine build drive), **#1452** (device-add CONNECT stage). Each is red-by-construction until this lands. ## Why human Sequencing + a member-facing trust call: **when** to flip the entire founding experience to the new page and **delete v1** (Ben's 2026-09-12 "no more v1/v2" ruling), given the v2 arc above is still part needs-design. That's Ben's ruling, not a two-way agent action — and it's the real residue behind the blocked live-drive batch. Filed by the #1447 session under ADR 0174 (rule 1: file follow-ups instead of picking up out-of-scope work) — veto anytime.
Owner

Done on main at fcf1c5b2 (branch founding-ui-two-colour-rail-ceremony, commits cb3139d4 → 62366a92): AppShell mounts FoundingPage; FoundingWizard, FoundingStack, FoundingStackList, FoundingWhatWillHappen, FoundingReviewCreate, the v1 harness and their tests are deleted; tests/e2e/fixtures/wizard.ts selects the page's walk. What is left is the live-drive CALLERS' re-sequence and its leg-list proof — that is #1447. Closing as done by that merge.

Done on `main` at `fcf1c5b2` (branch `founding-ui-two-colour-rail-ceremony`, commits `cb3139d4` → `62366a92`): `AppShell` mounts `FoundingPage`; `FoundingWizard`, `FoundingStack`, `FoundingStackList`, `FoundingWhatWillHappen`, `FoundingReviewCreate`, the v1 harness and their tests are deleted; `tests/e2e/fixtures/wizard.ts` selects the page's walk. What is left is the live-drive CALLERS' re-sequence and its leg-list proof — that is #1447. Closing as done by that merge.
ben closed this issue 2026-09-12 17:31:26 +00:00
Sign in to join this conversation.
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
Matou/idss#1455