session: deploy phase 3 and prove it end to end — coa-shared on matou, real build for matou-smoke (phase-3 plan Task 19) #81

Closed
opened 2026-08-31 05:20:55 +00:00 by ben · 3 comments
Owner

Plan

docs/superpowers/plans/2026-08-31-coa-phase-3.md Task 19.

Steps

  1. make host LIMIT=matou -t coa_shared → https://coa-infra.matou.nz/api/health 200; create + delete a matou-smoke tenant via /admin/tenants (tenant dirs live in the config-data docker volume — delete with docker exec).
  2. make host LIMIT=matou -t coa with the phase-3 env → /api/build-complete answers 401 to a bad signature.
  3. Submit matou-smoke (shared backend) from a browser → status.json building; coa-builds run → five links on the page; installers-ready email from notify@mail.matou.nz; git log origin/main -1 -- communities/matou-smoke shows the callback publish; the AppImage reaches a pre-filled /setup.
  4. make rebuild SLUG=matou-smoke → build 2. Clean up: tenant, Releases, communities/matou-smoke (the one sanctioned deletion, by a normal laptop commit).
  5. STATUS.md header + log; docs/GOTCHAS.md entries earned.

depends_on

  • coa: Tasks 8, 11, 12, 18; phase-2 deploy #39
  • matou-infrastructure: auth merge, tenant mode, coa mode (issues linked below)
  • matou-distributed-servers: coa_shared role, coa role phase-3 env (issues linked below)

Why session

Live hosts, real dispatch, real tenant, real email — one-way doors approved on Task 18b.

## Plan `docs/superpowers/plans/2026-08-31-coa-phase-3.md` **Task 19**. ## Steps 1. `make host LIMIT=matou -t coa_shared` → `https://coa-infra.matou.nz/api/health` 200; create + delete a `matou-smoke` tenant via `/admin/tenants` (tenant dirs live in the config-data **docker volume** — delete with `docker exec`). 2. `make host LIMIT=matou -t coa` with the phase-3 env → `/api/build-complete` answers 401 to a bad signature. 3. Submit `matou-smoke` (shared backend) from a browser → `status.json` `building`; coa-builds run → five links on the page; installers-ready email from `notify@mail.matou.nz`; `git log origin/main -1 -- communities/matou-smoke` shows the callback publish; the AppImage reaches a pre-filled `/setup`. 4. `make rebuild SLUG=matou-smoke` → build 2. Clean up: tenant, Releases, `communities/matou-smoke` (the one sanctioned deletion, by a normal laptop commit). 5. `STATUS.md` header + log; `docs/GOTCHAS.md` entries earned. ## depends_on - coa: Tasks 8, 11, 12, 18; phase-2 deploy #39 - matou-infrastructure: auth merge, tenant mode, `coa` mode (issues linked below) - matou-distributed-servers: `coa_shared` role, `coa` role phase-3 env (issues linked below) ## Why session Live hosts, real dispatch, real tenant, real email — one-way doors approved on Task 18b.
Author
Owner
Cross-repo dependencies: - matou-infrastructure: https://git.matou.nz/Matou/matou-infrastructure/issues/3, https://git.matou.nz/Matou/matou-infrastructure/issues/4, https://git.matou.nz/Matou/matou-infrastructure/issues/5 - matou-distributed-servers: https://git.matou.nz/Matou/matou-distributed-servers/issues/6, https://git.matou.nz/Matou/matou-distributed-servers/issues/7 - matou-app kit plan: https://git.matou.nz/Matou/matou-app/issues/237, https://git.matou.nz/Matou/matou-app/issues/238, https://git.matou.nz/Matou/matou-app/issues/239, https://git.matou.nz/Matou/matou-app/issues/240, https://git.matou.nz/Matou/matou-app/issues/241, https://git.matou.nz/Matou/matou-app/issues/242, https://git.matou.nz/Matou/matou-app/issues/243, https://git.matou.nz/Matou/matou-app/issues/244, https://git.matou.nz/Matou/matou-app/issues/245
Author
Owner

End-to-end proof complete 2026-09-04 (STATUS.md d18adac has the full record):

  • coa_shared + phase-3 coa role live on matou; matou-smoke builds 1 & 2 rode the pipeline 09-02/03 (Releases coa-matou-smoke-v1/v2, ready flips 7b9d66c/6f3ac08, emails in Stalwart).
  • Fresh path 09-04 with ngati-example: submit publish e42411a → tenant healthy at coa-infra.matou.nz/ngati-example/api/health → dispatch (org PAT) → run 33858085607 green from pin 9c53731 (matou-app v0.6.3) → Release coa-ngati-example-v1 (5 installers) → callback flipped ready/build 1 (publish 713761d) → Poster CTA live on coa.matou.nz/c/ngati-example → installers-ready email delivered (Stalwart 250, 09:42Z).

Residue tracked elsewhere: #115/PR #116 (logo path), matou-app#359 (filename version skew), smoke cleanup after Ben verifies the fresh app. This ticket (and #79/#80) can close on this proof.

End-to-end proof complete 2026-09-04 (STATUS.md d18adac has the full record): - `coa_shared` + phase-3 `coa` role live on `matou`; matou-smoke builds 1 & 2 rode the pipeline 09-02/03 (Releases coa-matou-smoke-v1/v2, ready flips 7b9d66c/6f3ac08, emails in Stalwart). - Fresh path 09-04 with **ngati-example**: submit publish `e42411a` → tenant healthy at `coa-infra.matou.nz/ngati-example/api/health` → dispatch (org PAT) → run 33858085607 green from pin `9c53731` (matou-app v0.6.3) → Release `coa-ngati-example-v1` (5 installers) → callback flipped ready/build 1 (publish `713761d`) → Poster CTA live on `coa.matou.nz/c/ngati-example` → installers-ready email delivered (Stalwart 250, 09:42Z). Residue tracked elsewhere: #115/PR #116 (logo path), matou-app#359 (filename version skew), smoke cleanup after Ben verifies the fresh app. This ticket (and #79/#80) can close on this proof.
Author
Owner

Closing on the phase-3 end-to-end proof (Ben ruled 2026-09-04): deploys live on matou, matou-smoke builds 1–2 + the fresh ngati-example chain all proven (submit → tenant → dispatch → run 33858085607 → Release coa-ngati-example-v1 → ready flip → installers-ready email delivered). Full record: STATUS.md d18adac + the proof comment on #81.

Closing on the phase-3 end-to-end proof (Ben ruled 2026-09-04): deploys live on `matou`, matou-smoke builds 1–2 + the fresh ngati-example chain all proven (submit → tenant → dispatch → run 33858085607 → Release coa-ngati-example-v1 → ready flip → installers-ready email delivered). Full record: STATUS.md d18adac + the proof comment on #81.
ben closed this issue 2026-09-04 21:31:46 +00:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
Matou/coa#81
No description provided.