site: Done page links the community page; Review handles 409 slug-taken (phase-2 plan Task 8) #35
Labels
No labels
agent-blocked
agent-working
bug
deferred
enhancement
model-haiku
model-opus
model-sonnet
needs-info
needs-triage
no-triage
priority
product-decision
ready-for-agent
ready-for-human
ready-for-session
wontfix
No milestone
No project
No assignees
2 participants
Notifications
Due date
No due date set.
Blocks
Depends on
Reference
Matou/coa#35
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Plan
docs/superpowers/plans/2026-08-28-coa-phase-2.mdTask 8.Deliverable
site/src/api/types.ts:SubmitResultgains200 {accepted, slug, pageUrl}and409 {error:'slug-taken', slug}.Review.tsx: on 200 navigate to/done?slug=<slug>&page=<encodeURIComponent(pageUrl)>; on 409 seterrors['brand.slug'] = 'That short name is already taken — choose another'and jump tobrand.Done.tsx: renders the link (<a href={page}>) and "We've emailed your contact address — the page shows "build pending" until the installers are ready." Tests:site/src/pages/Done.test.tsx; two new cases inReview.test.tsxusing its existing harness.Acceptance
hrefis the page URL and the "build pending" copy.role="alert"containing "already taken"; 200 → route/donewithpage=in the search string.pnpm --filter @coa/site test && typecheckgreen; the mirrored types stay identical in shape to the server's.depends_on
out_of_scope
Any other copy changes to the form.
Phase gate
No build dispatch, no
coa-sharedprovisioning, no status transitions beyondpage-ready(phase 3). Never delete or rewrite anything undercommunities/(ADR 0002/0003).On hold (needs-info): Ben has an uncommitted site redesign in his local checkout touching exactly this ticket's files (
Review.tsx,Review.test.tsx,Wizard.tsx, plus schema tweaks). Working this now — by the session or a swarm worker — would conflict with that work. Re-addready-for-agentonce the redesign is pushed. Server side (#28–#34) is all on main, so this is the only thing between here and the e2e ticket.Unblocked: Ben pushed the site redesign (merged with the phase-2 server side in
42e14d6) and the workstation's claude-limit marker has cleared. Back toready-for-agent. Note for the worker:Review.tsx/Wizard.tsxchanged in the redesign — read the current code before applying plan Task 8's sketch.swarm-claim host=matou-dev-server-01 run=942
(automated multi-host claim — lowest live claim id works this ticket)
close-report for #35 — status
success⛔ close-report gates REFUSED this close — the following claims did not verify:
envelope
close-report for #35 — status
success⚠️ close-report gates passed and the checks are green, but the merge POST failed (merge-failed 63 405) — PR #63 (#63) still open; a later reconcile pass or a human retries the merge.
envelope
close-report for #35 — status
success✅ close-report gates passed — every claim verified against main; issue closed.
envelope