rehearsal drive red at finish #530
Labels
No labels
agent-blocked
agent-working
autopilot
bug
deferred
deploy-pending
enhancement
landing-pr
model-haiku
model-opus
model-sonnet
needs-design
needs-info
needs-triage
no-triage
out-of-scope
priority
ready-for-agent
ready-for-human
ready-for-session
rehearsal-183
snapshot-pending
standing-drive
wayfinder:grilling
wayfinder:map
wayfinder:prototype
wayfinder:research
wayfinder:task
wontfix
No milestone
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Blocks
Reference
Matou/idss#530
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
(headless diagnosis unparseable — raw stdout saved to logs/reporter-claude.out)
drive
20260814T160715Zred atfinish:finish faulted: the gateway deploy failed — The gateway deploy failed. [There is no old operating system to roll back to — this machine was taken over for the community.]evidence:
test-results/…/20260814T160715Z/on matou-workstation (legs.json, droplet-journal.txt, trace)Diagnosis (by hand — the reporter's diagnosis call is dead for the day: account 2 crossed its weekly limit ~16:00Z, verified by direct probe; both swarm accounts now reset 8am UTC Aug 15):
Not a code defect — an external wall. The deploy's honest #499/#524 door probe ran its full budget because Caddy could never obtain the wildcard cert:
(
logs/droplet-caddy.txt, repeating every ~2 min across the whole finish budget — the #524 harvest is why we can see this at all.)Five drives today (
042259Z/050102Z/062452Z/145526Z/153243Z) each obtained fresh*.rehearsal.idss.nzcerts and destroyed them with their droplets. Let's Encrypt production allows 5 per exact identifier set per rolling 7 days — the set is walled until the oldest ages out (~Aug 21). Every future drive-heavy day will hit this wall by afternoon under the current shape.The finish-leg fault frame carried the DEPLOY summary but not the cert cause — the drive-visible copy names "gateway deploy failed", the real cause only lives in the caddy harvest. Worth folding into the fix.
Decision options (Ben's ruling needed — posted in-session): (A) persist/seed Caddy cert storage across drives — zero new orders per re-drive, keeps the real-ACME bar, also product-relevant (a re-founding community hits this same wall; ADR-worthy); (B) rotate the rehearsal slug to a fresh identifier set — instant unblock, hand-landable tonight, bounded by the 50-orders/week-per-registered-domain budget on idss.nz; (C) LE staging for drives — rejected: staging certs aren't browser-trusted, breaks the ceremony window and the parity bar; (D) wait ~7 days — kills the ratchet's cadence.
Relabelled
ready-for-sessionunder ADR 0174: the diagnosis needs the evidence bundle on matou-workstation (test-results/…/20260814T160715Z/) — an interactive session's standing, not Ben's hands. Escalates toready-for-humanonly if the diagnosis lands on a one-way door.Ben ruled (in-session, 2026-08-14): B tonight, A as a ticket.
b9f12f6—REHEARSAL_SLUGenv-tunable, default rotated torehearsal-b(spec's S5 claim + teardown offboard read the same export; GOTCHAS #32 records the wall and the rotation rule). Fresh identifier set = fresh budget of 5; the next wall is an env flip, not a commit.Closing: the mitigation is landed and the drive re-fires on the new set. Token-side note for the record: the swarm's ORG-secret account was NEVER limited (workers landed #526/#529 during the 'outage') — the reporter's limits were the workstation env token being the wrong account; Ben is swapping it.
Drive 17 (first on
rehearsal-b.idss.nz) proves the rotation.