rehearsal: the droplet drive's frontier becomes connect-and-watch — drop harvest-and-execute (ADR 0152, own-VPS T5) #385

Closed
opened 2026-08-10 02:26:29 +00:00 by ben · 1 comment
Owner

Slice T5 of docs/superpowers/specs/2026-08-10-own-vps-carrier-design.md. no-triage until T2+T3 land.

ADR 0152 removes the pasted install command from the own-VPS flow, so
app/tests/e2e/journey.droplet.spec.ts changes honestly:

  • harvestInstallCommand + the ssh-execute step retire (with their wizard
    fixture, if unused elsewhere — sshDroplet stays for droplet evidence);
  • the frontier step becomes: assert the DDR 0154 connection states
    (connecting → connected), then the stand-up rows with per-leg budgets
    (start from the private path's ceilings; they tighten from droplet
    evidence), then data-status="paired";
  • the legs registry's named skips update: provision-on-gateway, backup,
    invite-member, rescue-rung unblock from the carrier once it lands —
    each needs its own Stage-3 assertions plan before going live (spec:
    "legs as carriers land").

Acceptance:

  • OC_E2E_TARGET=droplet playwright --list shows the updated spec;
    tsc/vitest green
  • The drive's next live red (if any) is INSIDE the stand-up rows — the
    pairing-frontier red retires with the carrier
Slice T5 of `docs/superpowers/specs/2026-08-10-own-vps-carrier-design.md`. **no-triage until T2+T3 land.** ADR 0152 removes the pasted install command from the own-VPS flow, so `app/tests/e2e/journey.droplet.spec.ts` changes honestly: - `harvestInstallCommand` + the ssh-execute step retire (with their wizard fixture, if unused elsewhere — `sshDroplet` stays for droplet evidence); - the frontier step becomes: assert the DDR 0154 connection states (`connecting` → `connected`), then the stand-up rows with per-leg budgets (start from the private path's ceilings; they tighten from droplet evidence), then `data-status="paired"`; - the legs registry's named skips update: `provision-on-gateway`, `backup`, `invite-member`, `rescue-rung` unblock from the carrier once it lands — each needs its own Stage-3 assertions plan before going live (spec: "legs as carriers land"). Acceptance: - [ ] `OC_E2E_TARGET=droplet playwright --list` shows the updated spec; tsc/vitest green - [ ] The drive's next live red (if any) is INSIDE the stand-up rows — the pairing-frontier red retires with the carrier
Author
Owner

Done in 9e10828 (on main).

The droplet rehearsal drive drops harvest-and-execute for connect-and-watch (ADR 0152, own-VPS T5):

  • harvestInstallCommand + the ssh-execute step retire; harvestInstallCommand is deleted from wizard.ts (only the droplet spec used it). sshDroplet stays — its purpose shifts from paste-stand-in to droplet-side evidence (comment updated); droplet.ts/droplet.test.ts otherwise untouched.
  • The frontier step is now: assert the DDR 0154 connection states (data-status="connecting" → "connected"), drive the own-VPS stand-up rows leg by leg with per-leg budgets (waitForLeg over the full ownVPSJourneyRows order — connect · point · seed · enroll-{configure,build,copy,activate} · supply · pair + deploy rows; ceilings started from the private path's foundingPrefix.ts, tightening from droplet evidence), then data-status="paired". The pairing-pending → paired frontier retires with the carrier; the next live red (if any) now falls INSIDE the stand-up rows, named by waitForLeg.
  • reviewAndCreate lands on connect-own-vps (the T3 connection screen), not the deleted install-own-vps frame.
  • The legs registry's named skips update: provision-on-gateway, backup, invite-member, rescue-rung unblock from the founding carrier (#368) — each now waits on its own Stage-3 assertions plan before going live (spec: "legs as carriers land"); alert-email keeps its #369 leg reason.

Acceptance:

  • OC_E2E_TARGET=droplet playwright --list shows the updated spec (1 test in journey.droplet.spec.ts).
  • vue-tsc + app vitest green (787 pass; boot.test.ts needs go on PATH — runs green under nix .#go-ci, the known env gap noted since T3); prettier + eslint clean on the changed TS.
  • The pairing-frontier red retires; the drive's next live red (if any) is inside the stand-up rows.

T1–T5 of the own-VPS carrier arc are now all landed.

Done in `9e10828` (on `main`). The droplet rehearsal drive drops harvest-and-execute for connect-and-watch (ADR 0152, own-VPS T5): - `harvestInstallCommand` + the ssh-execute step retire; `harvestInstallCommand` is deleted from `wizard.ts` (only the droplet spec used it). `sshDroplet` stays — its purpose shifts from paste-stand-in to droplet-side evidence (comment updated); `droplet.ts`/`droplet.test.ts` otherwise untouched. - The frontier step is now: assert the DDR 0154 connection states (`data-status="connecting"` → `"connected"`), drive the own-VPS stand-up rows leg by leg with per-leg budgets (`waitForLeg` over the full `ownVPSJourneyRows` order — connect · point · seed · enroll-{configure,build,copy,activate} · supply · pair + deploy rows; ceilings started from the private path's `foundingPrefix.ts`, tightening from droplet evidence), then `data-status="paired"`. The pairing-pending → paired frontier retires with the carrier; the next live red (if any) now falls INSIDE the stand-up rows, named by `waitForLeg`. - `reviewAndCreate` lands on `connect-own-vps` (the T3 connection screen), not the deleted `install-own-vps` frame. - The legs registry's named skips update: `provision-on-gateway`, `backup`, `invite-member`, `rescue-rung` unblock from the founding carrier (#368) — each now waits on its own Stage-3 assertions plan before going live (spec: "legs as carriers land"); `alert-email` keeps its #369 leg reason. Acceptance: - `OC_E2E_TARGET=droplet playwright --list` shows the updated spec (1 test in `journey.droplet.spec.ts`). - vue-tsc + app vitest green (787 pass; `boot.test.ts` needs `go` on PATH — runs green under nix `.#go-ci`, the known env gap noted since T3); prettier + eslint clean on the changed TS. - The pairing-frontier red retires; the drive's next live red (if any) is inside the stand-up rows. T1–T5 of the own-VPS carrier arc are now all landed.
ben closed this issue 2026-08-10 06:55:01 +00:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
Matou/idss#385