breakglass: the Tier-3 recovery ceremony and the helper's break-glass orchestrator are honest refusals #307
Labels
No labels
agent-blocked
agent-working
autopilot
bug
deferred
deploy-pending
enhancement
landing-pr
model-haiku
model-opus
model-sonnet
needs-design
needs-info
needs-triage
no-triage
out-of-scope
priority
ready-for-agent
ready-for-human
ready-for-session
rehearsal-183
snapshot-pending
standing-drive
wayfinder:grilling
wayfinder:map
wayfinder:prototype
wayfinder:research
wayfinder:task
wontfix
No milestone
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set.
Reference
Matou/idss#307
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Known honest-refusal slice, filed for the production-deployment ledger (the rescue arc, spec #21).
internal/breakglass/tier3.go:48— the Tier-3 recovery ceremony is not wired.app/helper/cmd/helper/wiring_prod.go:249—newBreakglassOrchestratorreturnserrUnconfigured("break-glass"); only the dev wiring builds one (from fakes).So the break-glass path (dead control plane, laptop-driven recovery) does not exist in production — it refuses loudly, which is correct, but a community that loses its control plane today has no Tier-3 story.
Ask: slot real wiring into the rescue arc (spec #21) and decide whether any tier of it gates production deployment or ships as a fast-follow.
Filed from the 2026-08-05 fail-loud audit (three-agent pre-production sweep; findings verified against code).
Verification: Confirmed on
main. Both cited refusals are real and current: the Tier-3 recovery ceremony errors as unwired, and the production helper's break-glass orchestrator constructor returns an unconfigured error (only the dev wiring builds a working one, from fakes). So the break-glass path has no production story today — it fails loud, correctly, but a community with a dead control plane has no Tier-3 recovery.Recommendation:
ready-for-human— whether any tier of break-glass gates production deployment (and how it sequences against the rest of the rescue arc, spec #21) is a roadmap/risk call a maintainer needs to make, not something inferable from the code.Leaving
enhancement+ moving toready-for-human.Ben ruled (2026-08-06, ready-for-human sweep): does not gate initial production — same call as #306. The Tier-3 ceremony and the helper break-glass orchestrator land inside the rescue arc (spec #21). This ticket is the pick-up-later marker: relabelled
no-triageuntil the rescue arc opens.Ruled (Ben, 2026-08-12 backlog walk): fast-follow — no production gate. Rescue is reached only from an open incident; none of this wiring gates the initial production deployment. The real adapters/wiring ship with the rescue arc (spec #21). Stays parked until that arc opens.