Harness upgrade (watched): bump idss FACTORY_REF to dev-factory main (~16 commits: fleet-tui/heal.sh/run-swarm rework) #1684

Open
opened 2026-09-21 04:57:05 +00:00 by matou-build-agent · 1 comment

Deliberate, watched upgrade: bump idss FACTORY_REF to dev-factory main

Split off from #1683. #1683's CI-red was resolved the cheap, headless-safe way:
the token-leak fix landed in dev-factory (main + a commit off idss's own pin
base), and idss FACTORY_REF was bumped to that backport commit
(142a3c10, off the old pin 41495283) — a two-file-equivalent re-vendor with
zero harness churn. CI is green.

What that deliberately did not do: adopt dev-factory main's 15 intervening
commits (now ~16 with the fix merge). That pin..main diff is ~1.6k files — the
fleet-tui rework plus heal.sh/heal-lib.sh, run-swarm.sh, verdict-lib.sh,
landing-lib.sh, forgejo-lib.sh, close-report. No consumer repo is on
main
— pregnancy-navigator and matou-app both lag by ~15 too — so this is an
unadopted-in-the-field harness-core upgrade, not a field-proven one. It rewrites
the swarm's own heal.sh/run-swarm.sh; if it regresses, an unattended host's
swarm can wedge with no one watching. That is why #1683 (a headless one-shot
session) did not do it.

Ask (needs a WATCHED session — human eyes on the swarm as it lands)

  1. FACTORY_REF → dev-factory main tip, onboard.sh vendor, review the
    pin..main diff (heal/run-swarm/fleet-tui especially), reconcile any per-repo
    .sandcastle deltas.
  2. Watch a swarm tick + a rehearsal-heal cycle actually run green on the new
    harness before walking away.
  3. NB onboard.sh vendor has leaked the token into FACTORY_MANIFEST before
    (idss memory / prior sessions) — scrub before committing.

Rides with this

  • dev-factory limit-lib.sh companion land noted in #1682's Ask ("same change to
    dev-factory's copy") — the two upstream lands may want to ride together, and the
    next re-vendor is the moment #1682's copy arrives too.
## Deliberate, watched upgrade: bump idss `FACTORY_REF` to dev-factory `main` Split off from #1683. #1683's CI-red was resolved the cheap, headless-safe way: the token-leak fix landed in dev-factory (`main` + a commit off idss's own pin base), and idss `FACTORY_REF` was bumped to that backport commit (`142a3c10`, off the old pin `41495283`) — a two-file-equivalent re-vendor with **zero harness churn**. CI is green. What that deliberately did **not** do: adopt dev-factory `main`'s 15 intervening commits (now ~16 with the fix merge). That `pin..main` diff is ~1.6k files — the `fleet-tui` rework plus `heal.sh`/`heal-lib.sh`, `run-swarm.sh`, `verdict-lib.sh`, `landing-lib.sh`, `forgejo-lib.sh`, `close-report`. **No consumer repo is on `main`** — pregnancy-navigator and matou-app both lag by ~15 too — so this is an *unadopted-in-the-field* harness-core upgrade, not a field-proven one. It rewrites the swarm's own `heal.sh`/`run-swarm.sh`; if it regresses, an unattended host's swarm can wedge with no one watching. That is why #1683 (a headless one-shot session) did not do it. ## Ask (needs a WATCHED session — human eyes on the swarm as it lands) 1. `FACTORY_REF` → dev-factory `main` tip, `onboard.sh vendor`, review the `pin..main` diff (heal/run-swarm/fleet-tui especially), reconcile any per-repo `.sandcastle` deltas. 2. Watch a swarm tick + a rehearsal-heal cycle actually run green on the new harness before walking away. 3. NB `onboard.sh vendor` has leaked the token into `FACTORY_MANIFEST` before (idss memory / prior sessions) — scrub before committing. ## Rides with this - dev-factory `limit-lib.sh` companion land noted in #1682's Ask ("same change to dev-factory's copy") — the two upstream lands may want to ride together, and the next re-vendor is the moment #1682's copy arrives too.
Owner

The watched upgrade this ticket asks for is open as PR #2078: FACTORY_REF 79f5d5d → dev-factory main afc0303, the backport branch's remaining debt (#2048; #2050 subsumed by df #302) reconciled on main first, swarm.yml re-rendered. CI on the PR is being watched; the swarm tick + a rehearsal-heal cycle on the new harness are the acceptance this ticket names, after the merge.

The watched upgrade this ticket asks for is open as PR #2078: `FACTORY_REF` `79f5d5d` → dev-factory `main` `afc0303`, the backport branch's remaining debt (#2048; #2050 subsumed by df #302) reconciled on `main` first, `swarm.yml` re-rendered. CI on the PR is being watched; the swarm tick + a rehearsal-heal cycle on the new harness are the acceptance this ticket names, after the merge.
Sign in to join this conversation.
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
Matou/idss#1684
No description provided.