rehearsal phase 5 REGRESSION (2026-09-04): the full-install device journey still lands all 15 legs on the standing community after the phase-7 arc — elitebook-03 #1228

Closed
opened 2026-09-04 21:27:07 +00:00 by ben · 2 comments
Owner

Regression drive, not a frontier — Ben's instruction 2026-09-04: run the phase 2 → 6 drive regressions (phase 2 droplet, phase 3 self-hosted, phase 4 rented, phase 5 device, and the full IDIP journey — no phase-6 artifact exists in the tree, the number is reserved; the IDIP journey is the un-numbered lane between 5 and 7).

Since the last greens the shared substrate moved: the whole phase-7 VM-mode device arc (#1157–#1165, #1200, #1210, #1214–#1220 — ADR 0223 + amendments, the netbird relay/management lockstep to 0.72.3, NB_DISABLE_GEOLOCATION, the guest content-keyed payload slot, RemoveNode deleting machines/<n>/, RemoveDevice revoking the grant for real, the standing agent's 30 s guard and the origin-carrying unit), the freshness-tax landings (ADR 0208 ruling 3a re-supply, the rebuild park, the snapshot rail, the executor self-nudge b5581d13/a70edd95), #1216 fleet projection reading the guest dedication, #1211 brand-kit apply, #1213 archive API key, the IDIP credentials tail (#1078–#1087, ADR 0222 wiring #1104/#1155/#1156) and FACTORY_REF → 1ff3485. None of it was meant to touch this path — a red here is a REGRESSION and its defect ticket names the commit. A preflight staleness park on the served get.idss.nz pin (#918 class) is NOT a regression: dispatch the reseed rail.

Executor contract unchanged (GREEN is the only close; a red files its defect and blocks this issue; the drive re-fires when the last blocker closes; every red's screenshots get eyeballed before a green is believed). Driven through the standing-drive queue (REHEARSAL_DRIVE_QUEUE, docs/operator-app/rehearsal-drive.md "The drive queue + confirmation loop"): the markers below name this issue's target and how many consecutive GREENs close it.

Phase 5 last closed GREEN on #854 (drive 20260902T030641Z — all 15 adopt-path legs, the first complete device journey: standing → mint → device-create → agent-install → decline-resume → join → approve → assess → select-files → deploy-takeover → files-door → oidc-login → remove-device → reap → finish). Since then phase 7 ran the SAME spec with REHEARSAL_INSTALL_MODE=vm on this standing community (#1153, 20260904T184215Z, 16/16) and rewrote the shared legs' substrate — the mesh plane (relay + management lockstep, ADR 0223), RemoveNode/RemoveDevice (#1217/#1219), the standing agent's guard tick and origin-carrying unit (#1220), the fleet projection (#1216). Phase 5 is the FULL-install (takeover) mode of that journey — 11 of 16 legs shared byte-for-byte, so this is the drive that proves the phase-7 arc did not regress the takeover path.

Close condition

One GREEN drive, all 15 adopt-path legs green by LEG LIST (+ the recorded rented-prefix legs if the staleness gate re-founds — ruling 7: recorded legs, never a preflight abort), finish green (the false-green tell), device-reaped.txt reaped=true, screenshots eyeballed (post-removal Fleet = gateway-only).

Rules as on #854: the DEVICE droplet never survives a drive; the STANDING gateway rehearsal-e is never destroyed by a red — only the staleness gate recycles it (ADR 0208 ruling 3a: binary-only drift re-supplies in place); its lease is renewed by the executor. Known standing-gateway hazards, NOT regressions: #1221 (phantom joinable peer idss-gateway-rehearsal-e-0fa2 + "no recent signal" chip on the Fleet screen), #1222 (the #1214 fixes live only as /run drop-ins — a reboot of rehearsal-e resurrects both faults until a re-render).

Host: elitebook-03 (REHEARSAL_DRIVE_QUEUE, REHEARSAL_DRIVE_TARGET=device, DRIVE_EXCLUSIVE=slot since 2026-09-04 — the drive takes one pooled slot). Runs in parallel with the workstation's phase 2 → 3 → 4 → IDIP chain; the two hosts share no slug.

Regression drive, not a frontier — Ben's instruction 2026-09-04: run the phase 2 → 6 drive regressions (phase 2 droplet, phase 3 self-hosted, phase 4 rented, phase 5 device, and the full IDIP journey — no phase-6 artifact exists in the tree, the number is reserved; the IDIP journey is the un-numbered lane between 5 and 7). Since the last greens the shared substrate moved: the whole phase-7 VM-mode device arc (#1157–#1165, #1200, #1210, #1214–#1220 — ADR 0223 + amendments, the netbird relay/management lockstep to 0.72.3, `NB_DISABLE_GEOLOCATION`, the guest content-keyed payload slot, `RemoveNode` deleting `machines/<n>/`, `RemoveDevice` revoking the grant for real, the standing agent's 30 s guard and the origin-carrying unit), the freshness-tax landings (ADR 0208 ruling 3a re-supply, the rebuild park, the snapshot rail, the executor self-nudge `b5581d13`/`a70edd95`), #1216 fleet projection reading the guest dedication, #1211 brand-kit apply, #1213 archive API key, the IDIP credentials tail (#1078–#1087, ADR 0222 wiring #1104/#1155/#1156) and `FACTORY_REF` → `1ff3485`. None of it was meant to touch this path — a red here is a REGRESSION and its defect ticket names the commit. A preflight staleness park on the served `get.idss.nz` pin (#918 class) is NOT a regression: dispatch the reseed rail. Executor contract unchanged (GREEN is the only close; a red files its defect and blocks this issue; the drive re-fires when the last blocker closes; every red's screenshots get eyeballed before a green is believed). Driven through the standing-drive **queue** (`REHEARSAL_DRIVE_QUEUE`, `docs/operator-app/rehearsal-drive.md` "The drive queue + confirmation loop"): the markers below name this issue's target and how many consecutive GREENs close it. Phase 5 last closed GREEN on #854 (drive `20260902T030641Z` — all 15 adopt-path legs, the first complete device journey: `standing → mint → device-create → agent-install → decline-resume → join → approve → assess → select-files → deploy-takeover → files-door → oidc-login → remove-device → reap → finish`). Since then phase 7 ran the SAME spec with `REHEARSAL_INSTALL_MODE=vm` on this standing community (#1153, `20260904T184215Z`, 16/16) and rewrote the shared legs' substrate — the mesh plane (relay + management lockstep, ADR 0223), `RemoveNode`/`RemoveDevice` (#1217/#1219), the standing agent's guard tick and origin-carrying unit (#1220), the fleet projection (#1216). Phase 5 is the FULL-install (takeover) mode of that journey — 11 of 16 legs shared byte-for-byte, so this is the drive that proves the phase-7 arc did not regress the takeover path. ## Close condition **One GREEN drive, all 15 adopt-path legs green by LEG LIST (+ the recorded rented-prefix legs if the staleness gate re-founds — ruling 7: recorded legs, never a preflight abort), `finish` green (the false-green tell), `device-reaped.txt` `reaped=true`, screenshots eyeballed (post-removal Fleet = gateway-only).** Rules as on #854: the DEVICE droplet never survives a drive; the STANDING gateway `rehearsal-e` is never destroyed by a red — only the staleness gate recycles it (ADR 0208 ruling 3a: binary-only drift re-supplies in place); its lease is renewed by the executor. Known standing-gateway hazards, NOT regressions: #1221 (phantom joinable peer `idss-gateway-rehearsal-e-0fa2` + "no recent signal" chip on the Fleet screen), #1222 (the #1214 fixes live only as `/run` drop-ins — a reboot of rehearsal-e resurrects both faults until a re-render). Host: **elitebook-03** (`REHEARSAL_DRIVE_QUEUE`, `REHEARSAL_DRIVE_TARGET=device`, `DRIVE_EXCLUSIVE=slot` since 2026-09-04 — the drive takes one pooled slot). Runs in parallel with the workstation's phase 2 → 3 → 4 → IDIP chain; the two hosts share no slug. <!-- rehearsal-target: device --> <!-- rehearsal-confirm: 1 -->

drive 20260904T212812Z GREEN end to end — evidence (legs.json, durations, trace, host facts) in test-results/drive-device/20260904T212812Z/ on the executor host; a representative screenshot is attached here if one was captured (#596). Closing per the standing instructions: the device journey passes, #183 is ready to be boring.

drive `20260904T212812Z` GREEN end to end — evidence (legs.json, durations, trace, host facts) in `test-results/drive-device/20260904T212812Z/` on the executor host; a representative screenshot is attached here if one was captured (#596). Closing per the standing instructions: the device journey passes, #183 is ready to be boring.
Author
Owner

Leg-list verification (regression run 2026-09-04): run 20260904T212812Z is a TRUE green — 15/15 in the #854 order (standing 9s → mint → device-create → agent-install → decline-resume 9s → join 46s → approve 7s → assess → select-files → deploy-takeover 1003s → files-door 3s → oidc-login 22s → remove-device 63s → reap 4s → finish), verdict.json green with 0 skips, finish green, device-reaped.txt reaped=true, 25 min wall (21:31 → 21:56Z), commit 840371e1. Screenshots eyeballed: files-door-dash.png = node-req-0005 active, Files & documents HEALTHY on files.rehearsal-e.idss.nz; oidc-login-dash.png = Nextcloud admin Basic settings behind the first-run modal (the operator IS admin); remove-device-dash.png / finish-dash.png = Fleet back to gateway-only. The Fleet header still shows the #1221 phantom joinable peer idss-gateway-rehearsal-e-0fa2 + the gateway row's "no recent signal" chip — known, not a regression. First full-install device drive since the phase-7 arc (#1210/#1214–#1220): the takeover path did not regress. Close stands.

**Leg-list verification (regression run 2026-09-04):** run `20260904T212812Z` is a TRUE green — 15/15 in the #854 order (`standing 9s → mint → device-create → agent-install → decline-resume 9s → join 46s → approve 7s → assess → select-files → deploy-takeover 1003s → files-door 3s → oidc-login 22s → remove-device 63s → reap 4s → finish`), `verdict.json` green with 0 skips, `finish` green, `device-reaped.txt` `reaped=true`, 25 min wall (21:31 → 21:56Z), commit `840371e1`. Screenshots eyeballed: `files-door-dash.png` = node-req-0005 active, Files & documents HEALTHY on `files.rehearsal-e.idss.nz`; `oidc-login-dash.png` = Nextcloud admin Basic settings behind the first-run modal (the operator IS admin); `remove-device-dash.png` / `finish-dash.png` = Fleet back to gateway-only. The Fleet header still shows the #1221 phantom joinable peer `idss-gateway-rehearsal-e-0fa2` + the gateway row's "no recent signal" chip — known, not a regression. First full-install device drive since the phase-7 arc (#1210/#1214–#1220): the takeover path did not regress. Close stands.
Sign in to join this conversation.
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
Matou/idss#1228
No description provided.