rented drive: an INCONCLUSIVE cert-seed verdict (return 2) kills smoke-private-path.sh under set -e AFTER a 20/20 journey — green drive reads RED, nothing is filed, the executor re-rents every tick #1059

Closed
opened 2026-08-31 06:11:59 +00:00 by ben · 0 comments
Owner

Failure

Rented regression drive 20260831T055338Z (#1053, matou-workstation): the Playwright journey passed 20/20 (rent-fails-clean … enroll-activate 239s … founded → heartbeat-repoint → release, 8.4 min), yet scripts/smoke-private-path.sh exited 2 and the cycle reported ==> RED (exit 2). The reporter then said no red legs and drive rc=0 — green drive, nothing to file, so #1053 was neither closed nor blocked — and the executor re-rented a droplet on the very next tick (20260831T060523Z) to repeat the same green-then-exit-2. A hot loop on a green drive (#1035 class), paid in droplets.

Cause

oc_caddy_zero_obtain_verdict (scripts/lib/rehearsal-droplet.sh) returns 2 on INCONCLUSIVE — its header says "this never gates the drive, so the caller ignores the return". But oc_droplet_assert_zero_obtain calls it bare, and is itself called bare from oc_rented_cleanup (line ~1281) under the smoke script's set -e, so the 2 unwinds straight out of the script before its DRIVE GREEN line. The offline tests (cases 15/17) exercise INCONCLUSIVE only inside $(...), where bash drops errexit — they could never catch it.

Latent since #988/#989 (08-29): on today's drive the seed took, the live capture logs/caddy-rented.txt held a single line with no TLS activity, and the verdict was INCONCLUSIVE for the first time on a green rented drive (last rented green was #720, 08-26).

Fix

oc_caddy_zero_obtain_verdict "$caddy_log" || true — the documented contract, made real — plus test 17b in scripts/tests/rehearsal-rented-certs-test.sh running the assertion in a separate bash -e process (errexit LIVE) and asserting control returns. GOTCHAS entry.

Follow-up (separate ticket): the cycle must not re-fire blindly when the reporter finds journey rc=0 and no red leg but the smoke rc≠0; and the INCONCLUSIVE itself (a 1-line live caddy journal while the seed took) is an evidence blind spot.

## Failure Rented regression drive `20260831T055338Z` (#1053, matou-workstation): the Playwright journey passed **20/20** (`rent-fails-clean` … `enroll-activate` 239s … `founded` → `heartbeat-repoint` → `release`, 8.4 min), yet `scripts/smoke-private-path.sh` exited **2** and the cycle reported `==> RED (exit 2)`. The reporter then said `no red legs and drive rc=0 — green drive, nothing to file`, so #1053 was neither closed nor blocked — and the executor **re-rented a droplet on the very next tick** (`20260831T060523Z`) to repeat the same green-then-exit-2. A hot loop on a green drive (#1035 class), paid in droplets. ## Cause `oc_caddy_zero_obtain_verdict` (`scripts/lib/rehearsal-droplet.sh`) returns **2** on INCONCLUSIVE — its header says "this never gates the drive, so the caller ignores the return". But `oc_droplet_assert_zero_obtain` calls it **bare**, and is itself called bare from `oc_rented_cleanup` (line ~1281) under the smoke script's `set -e`, so the 2 unwinds straight out of the script before its `DRIVE GREEN` line. The offline tests (cases 15/17) exercise INCONCLUSIVE only inside `$(...)`, where bash drops errexit — they could never catch it. Latent since #988/#989 (08-29): on today's drive the seed took, the live capture `logs/caddy-rented.txt` held a single line with no TLS activity, and the verdict was INCONCLUSIVE for the first time on a green rented drive (last rented green was #720, 08-26). ## Fix `oc_caddy_zero_obtain_verdict "$caddy_log" || true` — the documented contract, made real — plus test 17b in `scripts/tests/rehearsal-rented-certs-test.sh` running the assertion in a separate `bash -e` process (errexit LIVE) and asserting control returns. GOTCHAS entry. Follow-up (separate ticket): the cycle must not re-fire blindly when the reporter finds journey rc=0 and no red leg but the smoke rc≠0; and the INCONCLUSIVE itself (a 1-line live caddy journal while the seed took) is an evidence blind spot.
ben closed this issue 2026-08-31 06:13:47 +00:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
Matou/idss#1059
No description provided.