backstop-tick.sh order-repos call assumes the first registry repo's pin has the mode — matou-workstation backstop dead since 04:15Z #84

Closed
opened 2026-08-25 18:32:30 +00:00 by matou-build-agent · 1 comment

Symptom. matou-workstation's backstop cron has dispatched nothing since the 04:15Z tick on 2026-08-25. Every */15 tick since logs only date: invalid date '-Matou/idss minutes' to ~/swarm/logs/backstop.log — zero dispatch/skip lines. Forgejo's own :15/:45 scheduler is still firing, so work continued, but the #238 safety net is down on the fleet's only backstop host.

Cause — version skew between the renderer and the first registry repo's pin. The backstop-tick.sh rendered at 04:11Z (the #45 stalest-first change) opens with:

for _slug in $(bash "/home/dev/swarm/Matou/idss/.sandcastle/schedule-backstop.sh" order-repos Matou/idss Matou/matou-app Matou/dev-factory Matou/matou-website); do

It calls the first registry repo's vendored copy of schedule-backstop.sh — but Matou/idss is pinned at bd48fd6, which predates the order-repos mode. That copy parses order-repos as the workflow file and Matou/idss as window-minutes, then dies under set -euo pipefail on date -d "-Matou/idss minutes". The $(...) yields nothing, the for-loop iterates zero times, and no repo is ever ticked. Silent total outage, green cron.

Fix options.

  1. Renderer picks the schedule-backstop.sh copy to call by capability (grep for order-repos) or always uses the newest-pinned repo's copy — not blindly the first registry entry.
  2. And/or: order-repos failure must not kill the whole tick — fall back to registry order (|| printf '%s\n' <slugs>).
  3. Operationally: re-vendor Matou/idss to a pin that carries order-repos (unblocks today's outage).

GOTCHAS candidate: the host-cron renderer assumes the first registry repo's vendored harness is at feature parity with the renderer itself; any new mode invoked cross-repo needs a capability check or a fallback.

Filed from Ben's mission-control session, 2026-08-25.

**Symptom.** matou-workstation's backstop cron has dispatched nothing since the 04:15Z tick on 2026-08-25. Every `*/15` tick since logs only `date: invalid date '-Matou/idss minutes'` to `~/swarm/logs/backstop.log` — zero dispatch/skip lines. Forgejo's own :15/:45 scheduler is still firing, so work continued, but the #238 safety net is down on the fleet's only backstop host. **Cause — version skew between the renderer and the first registry repo's pin.** The backstop-tick.sh rendered at 04:11Z (the #45 stalest-first change) opens with: ``` for _slug in $(bash "/home/dev/swarm/Matou/idss/.sandcastle/schedule-backstop.sh" order-repos Matou/idss Matou/matou-app Matou/dev-factory Matou/matou-website); do ``` It calls the **first registry repo's vendored copy** of schedule-backstop.sh — but Matou/idss is pinned at `bd48fd6`, which predates the `order-repos` mode. That copy parses `order-repos` as the workflow file and `Matou/idss` as window-minutes, then dies under `set -euo pipefail` on `date -d "-Matou/idss minutes"`. The `$(...)` yields nothing, the for-loop iterates zero times, and no repo is ever ticked. Silent total outage, green cron. **Fix options.** 1. Renderer picks the schedule-backstop.sh copy to call by capability (grep for `order-repos`) or always uses the newest-pinned repo's copy — not blindly the first registry entry. 2. And/or: `order-repos` failure must not kill the whole tick — fall back to registry order (`|| printf '%s\n' <slugs>`). 3. Operationally: re-vendor Matou/idss to a pin that carries `order-repos` (unblocks today's outage). **GOTCHAS candidate:** the host-cron renderer assumes the first registry repo's vendored harness is at feature parity with the renderer itself; any new mode invoked cross-repo needs a capability check or a fallback. Filed from Ben's mission-control session, 2026-08-25.
Author
Member

Duplicate of #83 (same defect, found independently from the same backstop.log). Closing in its favour; the severity correction — the outage is total, zero ticks since 04:15Z — is commented there.

Duplicate of #83 (same defect, found independently from the same backstop.log). Closing in its favour; the severity correction — the outage is total, zero ticks since 04:15Z — is commented there.
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
Matou/dev-factory#84
No description provided.